Beijing Zhongtian Road Tech Co., Ltd.
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Mastic Asphalt Sealer Bituminous Sealant On Concrete Repair 55 Elastic

Price Negotiable
Price: USD$900-1500/ton
MOQ: 20 tons
Delivery Time: 5-25 work days
Brand: ZhongTian
Product Description

 

Bitumen Mastic Sealant Bitumen Sealant nz Bituminous Pavement Sealer Bitumen Sealant Repair

 

1.Description

    Road Maintenance Hot-melt Asphalt Sealant is a composite modified bituminous sealant. With the advantage of fast hot-melt, strong adhesion, super performance of high and low temperature, easy construction performance and good anti-deformation recovery performance, Crack sealant can effectively seal pavement cracks and joints and maintain the sealing effect for a long time. Besides traffic can be restored immediately after the completion of construction.

 

    ZTA crack sealant can withstand the double test of high temperature and low temperature. It will not flow in high temperature weather, and will not harden in cold winter. It still has enough toughness to adapt to crack stretching caused by thermal expansion and contraction.

 

 

 

 

 

2.Technical Researches & Requirements

 

    To repair the cracks in asphalt pavements perfectly, the key is to choose a suitable type of sealant. Choosing the appropriate sealant as the material for pavement crack repair according to different regions & different climatic conditions and pavement crack characteristics. The product is divided into high temperature type, common type, low temperature type, cold type and severe cold type.

 

Specification:

Type Penetration/0.1mm Softening point/℃ Flow value(mm) Elastic recovery ratio/% Low temperature stretching
Test temperature/℃ Maximum displacement/mm conclusion
High temperature type 51 96 0 70 0 9.005 pass
normal type 69.10 92.60 1.87 62 -10 19.732 pass
Low temperature type 89 90.50 2.01 55 -20 45.600 pass
Cold type 108.30 87.40 2.65 48.1 -30 54.483 pass

 

Packing: 10KGS/CARTON

 

 

3. Features of Zhongtian highly performance bituminous crack sealant

Strong anti-water damage, anti-aging, anti-shedding and anti-deformation capabilities.
good stability. Not easy to segregate, no oil leakage.
Stable high and low temperature performance. High temperature does not deform and flow, low temperature does not crack.
The construction is convenient, preferably the outer film, which can be completely melted with the glue in the hot melt kettle.

4. Using guide & notice

 

1. Before filling, ensure that the cracks are dry and there is no water or rain within 24 hours before and after potting.

2. Whether to slot the joints according to customer requirements. Dust must be purged before potting.

3. When the temperature during the construction of the joint is lower than 5 °C, the crack should be preheated by a hot spray gun.

4. The filling joint is constructed by a filling machine with a stirring function. The sealing glue should be continuously stirred during the construction process. The sealing glue needs to be heated to 180-190 °C before the filling can be applied.

5. After the construction of the joint, it should be allowed to stand for 20 minutes to open the traffic. If it is open traffic immediately, it needs to sprinkle a small amount of fine sand or talcum powder, cement and other spacers to prevent the glue from sticking to the tire.

6. After the filling construction is completed, the sealing machine should be cleaned and the sealant should be avoided in the filling machine. After each section of the jointing construction, the filling machine should be cleaned.

 

 

 

 

    Beijing Zhongtian Road-Tech Co.,Ltd. is the Board of Directors of China Transportation Association and Transportation Committee of China Technological Market Association, with expert technical R&D team, continuous innovation ability, rich engineering experience and sufficient capacity. Also we participated in designated road material industry standard certificates.

 

 

                      Cold Asphalt Driveway Repair Asphalt Driveway Patching Asphalt Patch Bags 7

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Zhongtian Road Tech Co., Ltd.
Location Building 13, Guiyuan-Dongli, Beijing Economic & Technological Development Zone, Beijing, China
Contact Person Shakiya

Request A Quote

Please check your email address.
Your message must be at least 20 characters.