Beijing Silk Road Enterprise Management Services Co., Ltd.
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

Diesel Pressure Grouting Equipment Slurry Electric Grouting Machine

Price Negotiable
Price: Negotiable
MOQ: 1 set
Delivery Time: 3-5 working days
Brand: Silk
Product Description

Diesel Driven Stable Pressure Grouting Pump Machine Cement Slurry Material

 

Grouting Pump Machine

 

Description of Grouting Pump Machine:

 

Grouting pump machine is suitable for conveying flushing fluid (mud, clear water, saponification fluid) to boreholes in geological core drilling projects and small diameter diamond drilling within 1500 meters. It can also be used for medium and low pressure, cement slurry filling. The grouting pump machine consumes less energy, has flexible operation, and is easy to decompose, remove and repair.

 

Technical parameters of Grouting Pump Machine:

 

Cylinder number 3
Bore diameter 70mm
Piston stroke 70mm
Suction height 2.5 meter
Diameter of suction pipe 50mm
Diameter of outlet pipe 32mm
Motor power 7.5kw
Main shaft speed 1450 r/min
Working pressure 7 Mpa

 

Structure of Grouting Pump Machine:

 

Grouting pump machine is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.
Preparations before pumping:
After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Silk Road Enterprise Management Services Co., Ltd.
Location 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person Felicia Zhou

Request A Quote

Please check your email address.
Your message must be at least 20 characters.