Beijing Silk Road Enterprise Management Services Co., Ltd.
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

Yellow 5.5m3/H Gunite Sprayer Diesel Engine Dry Shotcrete Machine

Price Negotiable
Price: negotiation
MOQ: 1 Set
Delivery Time: 5-8 work days
Brand: Silk
Product Description

Diesel engine driven dry-type Shotcrete Machine Rental nice performance

 

Shotcrete Machine Rental
 
Rotor Repair of Shotcrete Machine Rental:

1. The removal and repair of the rotor:
Remove the main shaft of the rotor, pull out the plastic cavity from the rotor hole, clean the rotor thoroughly, turn the end face of the rotor, until the scar completely disappear. Check the plastic cavity and replace it if it is damaged.

2. Repair of rotor liner:
Use a delicate chisel to separate the liner from the rotor. Do not use heavy hammer or other tools to break the particularly hard and brittle rotor liner.
Thoroughly clean the joint surface of the side liner and rotor.
The surface is ground to the liner until the scar disappears.
When the lining plate is installed on the rotor, the column pin should be coated with the surface of the lining plate. Special attention should be paid to not making the column pin higher than the surface of the lining plate, so as not to damage the rubber sealing plate.

 
Parameters of Shotcrete Machine Rental:

Technical Parameters
Model PZ-5 PZ-6 PZ-6F PZ-7 PZ-9/WSP
Throughput(m3/h) 5-5.5 6 6-7 7 9
Transport Distance (Tidal Spray) (m) 200 200 200 200 200
Applicable Material (Cement/Sandstone) Ratio 1:3~5 1:3~5 1:3~5 1:3~5 1:3~5
Applicable Material (Water/Ash) Ratio ≤0.4~0.45 ≤0.4~0.45 ≤0.4~0.45 ≤0.4~0.45 ≤0.4~0.45
Aggregate size (mm) φ20 φ20 φ20 φ20 φ20
Working Pressure (MPa) 0.2~0.4 0.2~0.4 0.6~0.8 0.6~0.8 0.6~0.8
Feeding height (m) 1.1 1.1 1.1 1.1 1.1
Rotor speed (r/min) 11 11 11 11 11
Motor Power (KW) 5.5 5.5 7.5 7.5 7.5
Motor speed (r/min) 960 960 960 960 960

 
Operation Method of Shotcrete Machine Rental:
After the preparation work is finished, the mixing material can be added to the machine. The machine operator should first open the main valve, the valve of the upper air duct opens 1/3 circles, and then adjust the air pressure of the lower air duct (to the cyclone) to about 0.05-0.1 MPa (depending on the delivery distance). Then the sprayer opens the nozzle valve and gives the wet rock surface. At this time, the operator can start the machine and start shotcreting. Now the working pressure is about 0.2-0.4 MPa. According to the water-cement ratio of mixtures and the length of conveying distance, after adjusting and determining the wind pressure to the cyclone, the upper air pipe valve is opened again until there is no more material leakage at the machine outlet.

 

Pictures of Shotcrete Machine Rental:


 

Construction Site and Warehouse of Shotcrete Machine Rental:

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Silk Road Enterprise Management Services Co., Ltd.
Location 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person Felicia Zhou

Request A Quote

Please check your email address.
Your message must be at least 20 characters.