Product Description

600kw Turgo Water Turbine Generator For Hydro Power Plant

 

overview

 

 Turgo turbine is one of impulse turbine, applicable water head 30 to 300 meter. The center of jet flow with runner gyration plane angled 22.5°. the water flow contracted by the spray nozzle , flows entering one side of runner and comes out from other side. The structure is simple and easily inspected and maintained.

  

Specification

 

Name 600kw Turgo Micro Wheel Hydro Generator
Water Head 108.0m
Runner Diameters 0.72 m
Capacity2 400KW
Frequency 50HZ
Generator Voltage 400V
Layout pattern vertical
Material(blades) Stainless Steel ZG0Cr13Ni4Mo
Excitation Brushless
Generator Insulation F/F
Lifespan 50 years

 

 

Advantages 

 

Covers the boundary between Francis and Pelton

 

Limits Over-Pressure Effect over the penstock

 

Higher speed = weight and cost reduction

 

Maintains efficiency over a wide flow range

 

Superior abrasion resistance

 

Ease of operation and maintenance

 

our service:

1. The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hongya Power Generating Equipment To Utilities Limited
Location Anxi village, Yuping town,Hongya county, China
Contact Person Jack shen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.