Daoyunai Energy Saving Technology Limited
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Price Negotiable
Price: Variable
MOQ: 1 unit
Delivery Time: 20 working days
Brand: DAO
Product Description

Large diameter municipal sewer trenchless No-Dig rehab by CIPP UV technology

Preparation of UV curing construction instructions:

 

The drainage pipeline is gravity flow. The upstream (the front section in the downstream direction) and downstream (the rear section in the downstream direction) of the pipeline shall be determined in advance, so as to determine the sequence of repairing dragging materials.

If the site space allows, it is suggested to drag the bottom film and materials in the following order: starting from the upstream direction and dragging along the downstream direction.

 

1. pretreatment:

Ventilation, water stop, pumping, dredging, and cleaning. Ensure that there is no ponding, water leakage, foreign matter, serious deformation or dislocation, and other defects inside the pipeline.

 

2. robot CCTV inspection to determine whether it can be repaired

 

3. pull the bottom film with a robot: (use braided rope, do not replace the rope at will, otherwise the material or membrane will rotate in the pipe)

The connection buckle between the rope head and the bottom membrane shall be firmly fastened, and another rope for pulling materials shall be put on the upper end of the bottom membrane (if a winch is used, it shall be a steel wire rope). During the membrane pulling process, ensure that the materials and ropes are not mixed with the rotation of the bottom membrane.

 

For long-distance materials with large pipe diameters, soapy water can be added to the bottom film to reduce the friction when the material is dragged.

 

UV Cure Trenchless Construction
Pipe diameter  DN600-1200
Light source  LED or Mercury is available
Temperature  Two sensors for temperature monitoring
Leg  Interchanged as needed.
Other features are available to be custom-made.

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Daoyunai Energy Saving Technology Limited
Location Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
Contact Person Aaron Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.