Daoyunai Energy Saving Technology Limited
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Trenchless Sewer Pipe UV Lining Equipment For Sale Headlamp Wheel Rack

Price Negotiable
Price: Variable
MOQ: 1 piece
Delivery Time: 10 working days
Brand: DAO
Product Description

Advanced customized headlamp wheel rack of UV curing equipment manufacturer

 

Operation process of UV CIPP curing repair technology

 

Ultraviolet UV CIPP light-curing repair technology is used for the overall trenchless repair of underground municipal drainage pipes.

 

The pipe diameter covers typical sizes. It is a process of in-situ curing method. The repair length can pass through several sections of a manhole at a time, ranging from 50m to 200m. The repair time is 3-6 hours. It is mainly aimed at sewage pipes and rainwater pipes and is applicable to various common pipes, such as plastic pipes, concrete reinforced pipes, cast iron pipes, brick pipes, etc. It is widely used all over the world because of its wide range of applications, fast construction speed, and superior performance of repair materials.

 

The in-situ curing method, which originated in Britain in the 1970s, is called cured in place pipe in English, or CIPP for short. It forms a complete and new pipeline with structural strength inside the existing pipeline.

 

The basic process is to cut the corresponding length of the pre-impregnated resin hose (glass fiber or non-woven fabric) according to the length of the pipeline to be repaired, then put the hose into the pipeline to be repaired through specific processes, such as turning and dragging, and then solidify the hose through corresponding equipment, such as hot water boiler heating, steam heating or ultraviolet light irradiation, so as to achieve the purpose of repair.

 

UV CIPP, as a process of in-situ curing, refers to putting the glass fiber hose impregnated with resin into the pipeline by dragging, and then irradiating it with UV equipment to quickly cure and complete the repair.

 

 How  Fixed length for different pipes
 Application  Sewers
 QTY  Any

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Daoyunai Energy Saving Technology Limited
Location Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
Contact Person Aaron Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.