Cab Operation A5 16 / 3.2T Double Girder Yard Gantry Crane High Site Utilization Rate
Cab Operation A5 16 / 3.2T Double Girder Yard Gantry Crane High Site Utilization Rate
Introduction:
- Electrical control: Set up a synchronizing device to keep the speed synchronization of the running mechanisms on both sides through the electrical control system
- Excellent performance: equipped with a mature electrical control system to achieve anti-roll positioning and stable operation
- Novel structure: the door-shaped frame is adopted, the structure is stable, and a variety of different things can be smoothly loaded and unloaded
- Time-saving and labor-saving: high site utilization rate, large operating range, large adaptability and convenient maintenance
Technical Parameter:
| Capacity (ton) | 5 | 10 | 16/3.2 | 20/5 | 32/5 | 50/10 | ||
| Span (m) | 18, 22, 24, 26, 30, 35 | |||||||
| Lifting height (m) | 10, 11, 12 | |||||||
| Working class | A5 | |||||||
| Control way | Cabin control or remote control | |||||||
| Power source | 380V 50HZ 3phase (Could supply it as yours) | |||||||
| Trolley lifting mechanism | ||||||||
|
Lifting speed (m/min) |
Main hook | 11.3 | 8.5 | 7.9 | 7.2 | 7.5 | 5.9 | |
| Auxiliary hook | - | - | 14.6 | 15.4 | 15.4 | 10.4 | ||
| Trolley traveling mechanism | ||||||||
| Traveling speed (m/min) | 37.3 | 35.6 | 36.6 | 36.6 | 37 | 36 | ||
| Crane traveling mechanism | ||||||||
| Traveling speed (m/min) | 37.3 | 39.7 | 37.3 | 39.7 | 39.4 | 38.5 | ||
| Motor power(KW) | 40.8-51.8 | 41.5-52.8 | 80-77 | 84-81 | 99.3-117.3 | 126.5 | ||
| Rail track recommended | 43kg/m | 43kg/m or QU70 | ||||||
Advantages:
1. Module control speed, micro-speed and double speed;
2. Traveling and lifting smoothly;
3. The power for trolley moving adopts flat cable, sliding smoothly;
4. Control box layout is reasonable, easy to repair;
5. Protection class IP55;
6. Optional main power source ;
7. All external cable line number with mark;
8. Safety smooth touch line, high conductivity, small pressure drop;
9. Light weight, installation convenience;
10. Set electric taxi speed is high, ensure continuing power supply;
11. Optional speed control module, and can realize the micro speed and double speed.
How to choose:
1. Selection of gantry crane
2. Span and cantilever length
3. The principle of determining the wheelbase
4. The gantry crane spacing size is determined
Photo:
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
