Qingdao East Power Industry Equipment Co., Ltd
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

10 Ton Automatic Horizontal Industrial Steam Boiler Gas Oil Fired Rice Mill Use

Price Negotiable
Price: $67,500.00/Sets 1-1 Sets
MOQ: 1set
Delivery Time: 30 days
Brand: EPCB
Product Description
Product Description

,

Rice Mill Use 10 Ton Automatic Horizontal Natural Gas and Oil Fired Industrial Steam Boiler Price

  

ItemModel WNS0.5-0.7-Y(Q) WNS1.0-0.7-Y(Q) WNS1.5-0.7-Y(Q) WNS2-0.7-Y(Q) WNS2-1.25-Y(Q) WNS4-1.25-Y(Q) WNS6-1.25-Y(Q) WNS8-1.25-Y(Q) WNS10-1.25-Y(Q) WNS15-1.25-Y(Q) WNS20-1.25-Y(Q)
Rated capacity kg/h 500 1000 1500 2000 2000 4000 6000 8000 10000 15000 20000
Rated working pressure MPa 0.7 / 1.0 / 1.25
Rated steam temperature ℃  170 / 184 / 194
Design efficiency % ≥ 92
Fuel consumption

light oil 

kg/h

37 72 97 144 146 285 424.8 560 643 1042 1389

heavy oil 

kg/h

38 76 105 154 156.5 305.5 455.3 600.2 689.2 1117 1489

natural gas 

Nm³/h

44 85 116 172 174.3 340 507.1 668.6 767.7 1244 1659
Chimney diameter DN250 DN350 DN350 DN350 DN350 DN500 DN500 DN600 DN650 DN800 DN900

Largest 

transportation 

size

L (mm) 1950 2400 3300 3700 3400 4600 4800 6400 7200 7500 9150
W (mm) 1300 1670 1660 2000 2100 2550 2750 2750 3200 3500 4000
H (mm) 1500 1890 2050 2100 2368 2604 2950 3114 3262 3850 4500
Notes:This form only for your reference, if any changed, please refer to factory technical documents.

 


1. Adopts horizontal type three pass structure, absorbs the thermal expansion effectively. Uses large diameter corrugated furnace, large combustion space, high combustion efficiency.

2. Equipped with multiple safety protection devices, such as pressure controller, pressure transmitter, water level alarm, safety valve, etc.

3. Adopts PLC full automatic intelligent control cabinet and interlock protection program, has the protection function of water shortage, over pressure, over temperature, gas leakage, flame out, electric leakage, and phrase-lacking or overloading of motor, etc.

4. Equipped with reliable boiler auxiliaries,such as world known famous burner(Riello, Baltur, Unigas,Weishaupt,etc), international famous brand water pump(Grundfos, CNP), Siemens brand electric control elements, Fleck brand water softemner from USA, etc

5. Adopt the latest boiler technology, 100% flaw detection test, high quality, and long working life, low maintenance fee.

  

Our Services

1.100% safety, running stably, excellent water level and pressure control, fully automatic operation. 

2. Boiler running life > 20years. Adequate supply capacity, punctual delivery time.
3. One year warranty. It is free for you to get the damaged spares in warranty period (1 year) if there is any questions. Assure that we can supply you spares in boiler's all life. 
4. Special paint is used after assembly. Paint is particularly used in your climate area, which is anti-corrosion, anti-abrasion and color-fastness.

5. If there is any problem in install and use process, feel free to contact us and we will get back to you in first time to solve the problem.

6. Comprehensive after-sales service. We can design layout drawings of boiler system according to your actual requirement. Also can arrange engineers to guide installation & commissioning.

Packaging & Shipping

About Us

-------------------------------------Click Here to Learn Our Strength-------------------------------------------

FAQ

Q: Are you manufacturer?

A: Yes, we are manufacturer. Our factory is in Pingdu Qingdao.

 

Q: Can I get guarantee of products?

A: Yes, every product is 1 year quality warranty under customer correct using the products.

 

Q: Do you have any Certificate?

A: Yes. We have ISO9001, GB, CE, ASME, EAC certificate, etc.

 

Q: How can I pay you?

A: T/T, L/C is very well used.

 

Q: What about the production?

A: Produce time is 20~25days for <6Ton boiler, 25~40days for >8Ton boiler. 

 

Q: Could you offer some wear parts?

A: Yes, some chain grate bars, electric equipments in control panel box for example.

 

Q: What about the maintenance?

A: I will offer you the timely maintenance way sheet after installation of the boiler mainly parts.

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Qingdao East Power Industry Equipment Co., Ltd
Contact Person EPCB-Connie

Request A Quote

Please check your email address.
Your message must be at least 20 characters.