China Suppliers Insulating glass production line Automatic Desiccant Filling Machine
Price:
$3,500.00/Sets >=1 Sets
MOQ:
Negotiable
Delivery Time:
Negotiable
Brand:
Alger
Product Description
Product Description



The machine is used for desiccant filling into aluminum spacer, so as to absorb moisture in insulating glass sheet.
Features :
1.PLC control system
2.Both bended and corner-connected spacers are available
3.Adjustable filling height according to the spacer size
4.Automatic feeding material and plugging the drilled hole
5.Preset function for the filling speed.
Features :
1.PLC control system
2.Both bended and corner-connected spacers are available
3.Adjustable filling height according to the spacer size
4.Automatic feeding material and plugging the drilled hole
5.Preset function for the filling speed.
Product Paramenters
Voltage | 380V/50HZ |
Molecular sieve diameter | 0.5-0.8mm |
The width of aluminum spacer bar | 6-24mm |
Filling speed | 5-8mins |
Supply gas pressure | 0.6mpa |
Max filling size | 2000×2000mm |
Dimension | 1050x1000x4000mm |
Packing and shipping

FAQ
Q1: The MOQ for Automatic Molecular sieve filling machine?
A: 1 set.
Q2: How do I get fast response?
A: Send the E-mail to us or call us directly.
Q3: What about the lead time?
A: Sample usually needs 5-7 days, mass production time needs 15-30 days
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping is also optional for big quantity.
Q5. How to proceed an order for your products?
a: Firstly let us know your requirements or needs.
b: Secondly We quote according to your requirements or our suggestions.
c: Thirdly customer confirms the samples and places deposit for formal order. Also you can get the testing if necessary.
d: Fourthly We arrange the production and ship to you.
Q2: How do I get fast response?
A: Send the E-mail to us or call us directly.
Q3: What about the lead time?
A: Sample usually needs 5-7 days, mass production time needs 15-30 days
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping is also optional for big quantity.
Q5. How to proceed an order for your products?
a: Firstly let us know your requirements or needs.
b: Secondly We quote according to your requirements or our suggestions.
c: Thirdly customer confirms the samples and places deposit for formal order. Also you can get the testing if necessary.
d: Fourthly We arrange the production and ship to you.
Contact us

Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Liaoning Alger Building Material Industrial Co., Ltd.
Location
Xiguantun ,bayuquan district, yingkou city ,liaoning
Contact Person
Zoella