Double glass install spacer table and machine
Price:
$600.00/Sets 2-4 Sets
MOQ:
2 Sets
Delivery Time:
Negotiable
Brand:
AGM
Product Description
Product Features | ||
Product name | Double glass install spacer table and machine | |
size | 1600*1300*900mm | |
MOQ | 1SET | |
glass thickness | 3-12mm | |
Total power | 1.1KW | |
Package | films or wooden case | |
weight | 100kg | |
logo | Can be customized | |
This machine is used to install rubber spacer when making insulating glass. It can be rotated and positioned by 90% of the lifting vacuum suction cup. When installing the rubber strips, the glass with the rubber strips can be flipped and combined directly. The machine has advanced technology and reasonable structure. One machine with two functions, simple and quick operation.



Payment Terms
1. 30% of the contract value should be paid by T/T as deposit.
2. 70% of the contracted value should be paid by T/T before delivery.
2. 70% of the contracted value should be paid by T/T before delivery.
FAQ
Q1: Can I have a sample?
A: Yes of couse, but you should pay the freight.
Q2: How do I get fast response?
A: Send the E-mail to us or call us directly.
Q3: What about the lead time?
A: Sample usually needs 5-7 days, mass production time needs 15-30 days
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping is also optional for
big quantity.
Q5. How to proceed an order for your products?
a: Firstly let us know your requirements or needs.
b: Secondly We quote according to your requirements or our suggestions.
c: Thirdly customer confirms the samples and places deposit for formal order. Also you can get the testing if necessary.
d: Fourthly We arrange the production and ship to you.
A: Yes of couse, but you should pay the freight.
Q2: How do I get fast response?
A: Send the E-mail to us or call us directly.
Q3: What about the lead time?
A: Sample usually needs 5-7 days, mass production time needs 15-30 days
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping is also optional for
big quantity.
Q5. How to proceed an order for your products?
a: Firstly let us know your requirements or needs.
b: Secondly We quote according to your requirements or our suggestions.
c: Thirdly customer confirms the samples and places deposit for formal order. Also you can get the testing if necessary.
d: Fourthly We arrange the production and ship to you.
Exhibition




Related products



Contact us
Name: chris zhao
Phone/whatsapp:+8618840719339
Email:chris@ierjie.com
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Liaoning Alger Building Material Industrial Co., Ltd.
Location
Xiguantun ,bayuquan district, yingkou city ,liaoning
Contact Person
Zoella