Henan Dongfang Noodle Machine Group Co., Ltd.
                                                                                                           
Verified Supplier
51 Years
Since 1975
Menu
Machinery Food & Beverage Machinery Grain Product Making Machines

Automatic Noodle Drying Machine Plant For Dry Egg Noodles Production

Price Negotiable
Price: Negotiable
MOQ: 1 SET
Delivery Time: 60-120 days
Brand: Dongfang
Product Description

Automatic Noodle Drying Machine Plant For Dry Egg Noodles Production

 

The new generation of noodle drying machine stick noodle production line is our company's main selling equipment in recent years. This equipment has large capacity, small footprint, less labor force and low energy consumption. It is the main choice for noodle enterprises to achieve large-scale production, and is deeply welcomed by users.

 

Advantages of noodle drying machine:

 

  • Dongfang's new generation of drying room has a unique design, and the special track chain reduces running resistance and realizes zero rod drop;

  • The design of five vertical temperature zones ensures the continuous and stable change of temperature and humidity, which significantly improves the quality of noodles;

  • Adjusting the moisture discharge through frequency conversion and speed regulation, and control the humidity in each zone, which is convenient and reliable;

  • The ingenious design can make the hot and humid air at both ends of the drying room flow to the middle, reuse the waste heat, and reduce energy consumption by 20-30%.

 

Technical parameters

 

Product Name

Noodle Drying Machine

Drying Time

About 4-4.5 hours

Total length of drying room

50-90m

Heating Medium

Steam/thermal oil/hot water

Material

Stainless steel and carbon steel

Highlight

Automatic temperature and humidity control

 

FAQ:

 

1.Do you provide custom service?

We can design the machine according to your requirements (material, power, filling, etc.). At the same time, we will also provide you with expert guidance based on our many years of industry experience.

2.How long does it take to install?

Depending on your machine order the machine size, we will send one to two engineers to your factory, which will take about 40 to 60 days.

 

Packing and delivery

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Henan Dongfang Noodle Machine Group Co., Ltd.
Location No.18 Dongfang Road, Mazhai Industrial Zone, Erqi District, Zhengzhou, China
Contact Person Annie

Request A Quote

Please check your email address.
Your message must be at least 20 characters.