Low Carbon GI Steel Wire Rod SAE 1006 / SAE1008 18.0MM
Price:
USD 560 - 650 Per Ton
MOQ:
1 Ton
Delivery Time:
7-15 days
Brand:
HUIJIAN
Product Description
China Manufacture Direct Sale Low Carbon SAE 1006/SAE1008 Steel Wire Rod
Product Description
|
Product
|
wire rod
|
|
Variety
|
Soft wire,hard wire,spring wire,electrode wire,cold heading wire,electrolytic wire,welding wire etc.
|
|
Size
|
0.03-18.0MM Special specifications can also be produced according to drawing and sample.
|
|
Technique
|
Hot rolled
|
|
Application
|
Buiding , construction, machine made, kitchen ware made, equirment etc.
|
|
Tolerance
|
±1%
|
|
Payment Term
|
FOB CIF CFR etc.
|
Application
Wire rods are used across various industrial verticals, including the automobile, engineering, construction and consumer goods industries, to name a few. They are manufactured from steel billets or blooms in wire rod mills according into various forms (cross-sections) based on the various industrial requirements.
Packing and delivery


Company Introduce
Shandong Huijian Metal Materials Co., Ltd. is a new modern private enterprise integrating R&D, production and export. The company is located in Liaocheng, Shandong, a national excellent city known as (Jiangbei Water City), with a registered capital of 60 million yuan, covering an area of more than 100 acres, a construction area of 20,000 square meters, and more than 100 employees. The company has advanced production equipment and Mature technology, but also has a high-quality professional management and technical personnel team. The company has passed the international quality management system ISO9001: 2000 certification.
FAQ
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need special and rare materials,usually need 15-20 days to make shipment.
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need special and rare materials,usually need 15-20 days to make shipment.
Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.
Q3: Can we visit your factory?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.
Q3: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow
up your case.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.
up your case.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.
Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.
A: Yes. It can be customized as per the customers' request.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Huijian Metal Material Co., Ltd.
Location
No. 132, Huitong Logistics Park, Liaocheng Development Zone, Shandong Province, China
Contact Person
Anna
