HL BA ERW Stainless Steel Welded Pipe 0.3mm-150mm Wall Thickness
201 304 316 Stainless Steel Welded Tube HL BA ERW Stainless Steel Pipe
What is stainless pipe?
Stainless steel pipe is primarily used in piping systems for the transport of fluids or gases. We manufacture steel pipe from a steel alloy containing nickel as well as chromium, which give stainless steel its corrosion-resistant properties.
What is steel pipe used for?
Steel pipes are cylindrical tubes made from steel that are used many ways in manufacturing and infrastructure. They're the most utilized product made by the the steel industry. The primary use of pipe is in the transport of liquid or gas underground—including oil, gas, and water.
Product Description
| Item | 201 304 316 Stainless Steel Pipe |
| Standard | ASTM A240, JIS4304-2005, ASTM A167, EN10088-2-2005, GB/T3280-2007, etc |
| Material |
201,202,301,304,304L,304N,XM21,304LN,309S,310S,316,316Ti,316L, |
| Surface | the surface and finish of 410 Stainless Steel Bar: 2B, 2D, BA, NO.1, NO.4, NO.8, 8K, mirror, checkered, embossed, hair line, sand blast, Brush, etching, etc |
| Price Term | EXW FOB CFR CIF |
| Wall thickness | 0.3-150mm(SCH10S-XXS) |
| Outside diameter | 6.0-2500mm(1/8"-100") |
| Length | 6m,5.8m,8m,11.8m,12m or as required. |
| Package | Standard export package, suit for all kinds of transport, or as required. |
| Export to | Indonesia, Malaysia, Singapore , Saudi Arabia, Qatar , UAE, Iran, Iraq, Oman, South Africa, Nigeria, Kenya |

Details:
Features of STAINLESS STEEL PIPE
1.Not easily rust, acid resistance and corrosion resistance;
2.Widely used in light industry,heavy industry, daily necessities and the decoration industry;
3.Large and stable supplies, long-term supplies;
4.Prompt delivery, rich exporting experience.
Application
Finishes Of Stainless Steel Pipe
| Surface Finish | Definition | Application |
| 2B | Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. | Medical equipment, Food industry, Construction material, Kitchen utensils. |
| BA | Those processed with bright heat treatment after cold rolling. | Kitchen utensils, Electric equipment, Building construction. |
| NO.3 | Those finished by polishing with No.100 to No.120 abrasives specified in JIS R6001. | Kitchen utensils, Building construction. |
| NO.4 | Those finished by polishing with No.150 to No.180 abrasives specified in JIS R6001. | Kitchen utensils, Building construction, Medical equipment. |
| HL | Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. | Building Construction. |
| NO.1 | The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. | Chemical tank, pipe |
Common Chemical Composition
Grade |
C |
Si |
Mn |
P |
S |
Ni |
Cr |
Mo |
201 |
≤0.15 |
≤0.75 |
5.5-7.5 |
≤0.06 |
≤ 0.03 |
3.5-5.5 |
16.0-18.0 |
- |
301 |
≤0.15 |
≤1.0 |
≤2.0 |
≤0.045 |
≤ 0.03 |
6.0-8.0 |
16.0-18.0 |
- |
304 |
≤0.08 |
≤1.0 |
≤2.0 |
≤0.045 |
≤ 0.03 |
8.0-10.5 |
18.0-20.0 |
- |
304L |
≤0.03 |
≤1.0 |
≤2.0 |
≤0.035 |
≤ 0.03 |
9.0-13.0 |
18.0-20.0 |
- |
316 |
≤0.08 |
≤1.0 |
≤2.0 |
≤0.045 |
≤ 0.03 |
10.0-14.0 |
16.0-18.0 |
2.0-3.0 |
316L |
≤0.03 |
≤1.0 |
≤2.0 |
≤0.045 |
≤ 0.03 |
12.0-15.0 |
16 .0-1 8.0 |
2.0-3.0 |
321 |
≤0.08 |
≤1.0 |
≤2.0 |
≤0.035 |
≤ 0.03 |
9.013 |
17.0-1 9.0 |
- |
410 |
≤0.15 |
≤1.0 |
≤1.0 |
≤0.035 |
≤ 0.03 |
- |
11.5-13.5 |
- |
430 |
≤0.12 |
≤0.75 |
≤1.0 |
≤0.040 |
≤ 0.03 |
≤0.60 |
16.0-18.0 |
- |
Packing and delivery


Company Introduce
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need special and rare materials,usually need 15-20 days to make shipment.
A:Samples can be provided with samples' charge and courier fee by the buyer's side.
Q3: Can we visit your factory?
up your case.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.
A: Yes. It can be customized as per the customers' request.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.




