Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

C11 Engine Shaft 230-0065 223-7468 For CATERPILLAR

Price Negotiable
Price: Looking forward to your inquiry
MOQ: 1 set
Delivery Time: 2-5 work days
Brand: HDPARTS
Product Description

C11 Engine Eccentric Shaft 230-0065 223-7468 Suitable For CATERPILLAR Diesel Engines Parts

Specification

Applicable models C11
Type Eccentric shaft
Original number 230-0065 223-7468
Warranty 6 months
Engine Type  Diesel
Brand Name  HDPARTS
Condition  New
Size  OEM Size

 

Eccentric shaft structure and working principle

An eccentric shaft becomes an eccentric when a circle does not rotate around its center. The eccentric shaft is also a kind of cam. Generally speaking, the main purpose of the eccentric wheel is to generate vibration. Like the electric screen, the vibrator in the mobile phone uses the eccentric wheel. Most of the eccentric wheels are round wheels, because the round wheels are easy to manufacture and the process is simple.

Machining technology of eccentric shaft

In the process planning and fixture design of eccentric shaft machining, we should adopt the method of combination of process centralization and process decentralization, and design an automatic production line according to the production batch and actual production situation. When the process is organized according to the principle of process concentration, efficient machine tools and process equipment with high degree of automation are also widely used. This greatly improves productivity.

Processing procedure design

Part drawing analysis

Determine blank

Determine the processing method of the main surface

Determine positioning datum

Staging

Arrangement of heat treatment process

Machining dimensions and cutting parameters

Proposed process

 

 

 

Product Description

 

 

RODUCT CATEGORIES  

1570502302971052897

 

 

 

DELIVERY TIME:

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

Forklift Engine 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Location Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
Contact Person yang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.