Color Steel Downspout Roll Forming Machine , Full Automatic Downspout Elbow Machine

Price Negotiable
Price: USD8000-USD22500 PER SET
MOQ: 1 set
Delivery Time: 20-30 working days
Brand: JCX
Product Description

Metal  Steel Downspout Roll Forming Machine , Full Automatic Downspout Elbow Machine

 

 

1.  Application of downspout roll forming machine:

 

 

Metal drainage system has the excellent weather fastness. It has the advantages such as simple design, easy installation, safe and durable, elegant.

 

Our factory is producing the high quality downspout roll forming machines and export to Russia, India, Uzbekistan, Saudi Arabia, Turkey, etc.

 

It is widely used in the modern villas and multiple raises buildings.

 

 

Metal downspout is made by using the color steel or GGPI coils roll-pressing and end-closing, then use the special equipment hit-to-bend and necking.

 

 

 

 

2. Production Flows of downspout roll forming machine

 

Uncoiling the sheet---Infeed guiding--Roll forming---Measure length---Cutting the panel--panels to the supporter (option: automatic stacker)

 

 

 

 

 

3.  Product photo

 

 

4. Main components of downspout roll forming machine

 

Decoiler 1 Set
Guiding Equipment 1 Set
Roll Forming Unit 1 Set
Post Cutting Unit 1 Set
Hydraulic Station 1 Set
PLC Control System 1 Set
Reveiving Table 1 Set

 

 

5.Technical details of downspout roll forming machine:

 

Voltage 380V or 220V
Warranty 18 month
Roller 20rows
Forming speed 12-15m/min
Dimension(L*W*H) 8500mm*1200mm*1500mm
Base 300H steel
Diameter of shaft 70mm
Roller material 45# steel or hard chromium plating
Cutting type Hydraulic cutting type
Cutting blade Cr12
Main motor Power(Kw) 7.5KW
Color As your request
Material thickness 0.3-0.7mm or As your request
Material width 330mm or As your request
Transmission type Chain transmission+deceleration motor
Automation Full-automatic
Control system PLC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. Advantages

 

· Germany COPRA software design

 

· 5 engineers with more than 20 years experience

 

· 30 professional technician

 

· 20 sets advanced CNC production lines on site

 

· Passionate Team

 

· Installation engineers can reach your factory within 6 days

 

 

· 1.5 years maintenance and whole life technical support

 

7.  Installation service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if buyer needs)

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Botou Golden Integrity Roll Forming Machine Co., Ltd
Location Botou City, Beijing-Shanghai Expressway exit, Zhenggang Road (500 meters south of Botou Development Zone)
Contact Person Harry Yang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.