DianBingYuan Technology Co., Ltd
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

AIP504-13 S1 Yokogawa PLC Controller V-Net Coupler Module In Stock

Price Negotiable
Price: Inquiry
MOQ: 1pcs
Delivery Time: 1-3 work days
Brand: Yokogawa
Product Description

 Yokogawa AIP504-13 S1 V-Net Coupler Module New In Stock

 

Introduction

 

HISTORY OF CENTUM Twenty-four years have passed since the CENTUM was rolled out as the world’s first DCS in 1975. Up until now there have been several model changes. The first CENTUM had builtin microprocessors which at the time had begun to gather public attention as a technology offering great promise, and established the basic architecture of the CENTUM series in which the human interface and controllers are separated from one another and connected on a control bus. The first CENTUM introduced a new scheme, process operation and monitoring via CRTs and keyboards, to the world of process control. Present DCSs have inherited the basic architecture established by the CENTUMAs microprocessors advanced from 16-bit design to 32-bit design, Yokogawa released the CENTUM V in 1983 and the CENTUM-XL in 1988. Although at that time it was acknowledged that customers were dissatisfied with the fact that DCSs were closed systems, Yokogawa was focusing on incorporating into the CENTUM original devices and developing original operating systems and other software in order to gain better performance, by improving real-time controllability of controllers, increasing application capacity, and reducing the display retrieval time for the human interface. Each EOPS operator station, the human interface of the CENTUM-XL, was composed of up to 4 CRTs with 32-bit built-in processor, representing the best performance in those days

 
 


 

 

 

Packing & Delivery

 

1)100% brand New and Original Factory Seal!

2)Warranty: 1 year

3)Package: Original packing with cartons.

4)Delivery time: DHL,UPS,Fedex express shipping usually take 3-10 working days,depends on the country delivered to. In rare cases,the strict custom clearances will make the delivery time a bit longer,please be patient.

5) All the goods will be tested before shipment.

 


OTHER HOT PRUDUCTS
 

ANB10D S1 AMM22TJ ALE111-S00
ANB10S AMM25C ALF111
AND20 AMM32 S3 ALF111-S00
ANR10D AMM32C ALF111-S01
ANR10S AMM32CJ ALP111
ANS20 AMM32J S1 ALP111-S00
APM11 AMM32T ALP111-S00 S1
ARM15A sarm15a AMM32TJ ALP111-S01
ARM55C ARM55C-000 AMM42 S3 ALR111
ARM55D AMM42 S4 ALR111-S00
ARM55T AMM42T ALR111-S01
ARM55W AMM52T ALR121
ARS15B AMN11 AMN22 ALR121-S00
ARS15M AMN21 ALR121-S01
ARS55M AMN31 AMC80
ASD143 AMN32 AMM12 S3
ASD533 AMN33 AMM12C
AS-F9391CD-0 AMN34 AMM12T
ASI133 AMN51 AMM22 S3
ASI533 ANB10D AMM22C
ASR133 AMM22T AMM22M

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company DianBingYuan Technology Co., Ltd
Location No. 1024, Caitang Society, Huli District, Xiamen City
Contact Person Jon

Request A Quote

Please check your email address.
Your message must be at least 20 characters.