Guangzhou Wanxinlong Machinery Trading Co., LTD
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Turbocharged Excavator Replacement Parts , EC140B D4D 04258205KZ Diesel Engine Turbo

Price Negotiable
Price: Bargaining price
MOQ: 1-100
Delivery Time: 5-8 work days
Brand: ZN
Product Description

Engine Parts Turbocharged EC140B D4D 04258205KZ Excavator Engine

 

Product parameters

 

item
value
Condition
New
Applicable Industries
Garment Shops, Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Construction works
After Warranty Service
Online support
Local Service Loion
None
Showroom Loion
None
Video outgoing-inspection
Provided
Machinery Test Report
Not Available
Marketing Type
Ordinary Product
Place of Origin
Guangdong China
Warranty
6 months
After-sales Service Provided
Video technical support

 

Remanufacturing is an advanced form of resource cycle, which interprets one of the core values of "environmental protection". When purchasing remanufactured parts, users need to return old parts of the same model. Choose to remanufacture and join hands to create a beautiful home for sustainable development.
When the equipment fails, replace the remanufacturing components directly to minimize downtime and maintain productivity. Remanufacturing parts is a cost-effective solution that can help rejuvenate your equipment and improve productivity.
It has longer service life and higher reliability than ordinary maintenance parts. The general overhaul is designed to restore the performance level of the product before the failure. The quality standard is low, the life is shortened, and there is a risk of repeated maintenance. Compared with the replacement parts, the customer's.
The overall use cost is low. Replacement parts are often cheap but of low quality, not only dupliion.
The risk of maintenance, and has an irreversible impact on the life of the whole machine. At the same time, the loss of downtime may be much greater than the cost of replacing a new machine.

 

FAQ

 

1Q: Do you have your own factory? Can we have a visit?
1A: Absolutely, you are alwayswelcome to visit our factory.

2Q: How do you control the quality of the products?
2A: Our factory was obtained the ISO9001CERTIFIE.Every process of the production is strictly controlled. And all products will be inspected by QC before shipment.

3Q: How long is the delivery time?
3A: 2 to 7 days for ex-stock orders. 15 to 30 days for production.

4Q: Can we print our company logo onproduct and package?
4A: Yes, but the quantity of the order is required. And we need you to offer the Trademark Authorization to us.
 
5Q: Can you provide OEM BRAND package?
5A: Sorry, we can only offer our company ACT BRAND package or neutral packing,blank package ifyou need, and the Buyers' Brand as authorized.

6Q: How long is the warranty period?

6A: 3 months.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Wanxinlong Machinery Trading Co., LTD
Location Room 141, 107 Lianxi east road, Tianhe district, Guangzhou
Contact Person CHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.