Guangzhou Wanxinlong Machinery Trading Co., LTD
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

DA630 Supercharger Excavator Spare Parts 5327-988-6507 Hybrid Turbocharger

Price Negotiable
Price: Bargaining price
MOQ: 1-100
Delivery Time: 5-8 work days
Brand: ZN
Product Description

DA630 Supercharger For Liebherr 924 Spare Parts Of Excavator 5327-988-6507

 

Product Parameters

 

Part Name
Turbocharger
Appliion
Liehberr 924 Excavator
Machine Type
DA630
Part number
53279886507
Condition
High quality OEM new
MOQ
1Piece
Availability
in stock
Delivery
1-3 days (depend on order)
Payment term
T/T, Western Union, Tradeassurance
Shippment
By Sea, Air or DHL/FEDEX/TNT/EMS

 

The hydraulic pump of an excavator works on the principle of converting mechanical energy into hydraulic pressure. The pump is connected to the engine of the excavator by a drive shaft, which spins the pump's internal gears or pistons.

As the pump rotates, it creates a low-pressure suction zone that draws hydraulic fluid from the excavator's reservoir and into the pump's inlet port. The hydraulic fluid is then compressed by the pump and forced out through the outlet port at high pressure.

This high-pressure fluid flows through a series of hoses and valves to power the various hydraulic cylinders and motors loed on the excavator's boom, arm, and bucket. These hydraulic components use the pressure generated by the pump to lift heavy loads, move the excavator's arms and bucket, and perform other tasks.

The hydraulic pump of an excavator is typically designed with high capacity, durability, and efficiency to handle the demanding work conditions of the construction industry.

 

FAQ

Q1:How long is the warranted time? A:For natural broken, 3 months. Guarantee genuine parts.

Q2: What's payment you can accept? A:T/T, WESTERN UNION, CHINESE BANK,PAYPAL.

Q3: What's package? Can you give me the package according my requirement? A:Yes, Original packing or Neutral packing with wooden box or carton.

Q4: How about the lead time? A: (1) ln stock: 1-3 days.Always in 24 hours. (2) Out of stock: lt's according to your quantity, and we have cooperated with factory. We will let you know when we quote.

Q5: What's the shipping way you can offer? A: (1) Big order: By sea or by air.(It can reduce the costs). (2) Small order: DHL,TNT,UPS,FEDEX,EMS,ARAMEX.

Q6: What's the terms of the transaction? A:EXW,FCA,FAS,FOB, C&F,CIF,CPT,CIP,DAF,DES,DDP.

Q7: Do you accept small order? A:Yes, small order can accept.

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Wanxinlong Machinery Trading Co., LTD
Location Room 141, 107 Lianxi east road, Tianhe district, Guangzhou
Contact Person CHEN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.