Laser Cutting Stainless Steel Sheet Metal Parts Factory OEM CNC Laser Cutting Parts
Laser Cutting Stainless Steel Sheet Metal Parts Factory OEM CNC Laser Cutting Parts
Products Description
Computer Numerical Control (CNC) laser cutting commonly uses optics, an assist gas, and a guidance system to direct and focus the laser beam into the workpiece. The many benefits of CNC laser cutting include: Speed. Less waste. Broad range of materials.
What is the laser cutting process?
Laser cutting is a slitting process with which it is possible to cut metallic and non-metallic raw materials of different material thicknesses. This is based around a laser beam which is guided, formed, and bundled. When it hits the workpiece, the material heats up to the extent that it melts or vaporises.
Details Photos
Our Services Process:
Quotation: We promise your inquiry of stainless steel laser cutting parts can be quoted within 6 hours as long as we confirm your drawing and requirements.
Sample Making: It is fastest within 3 days.
Mass Production: During production, we can give you updates by sending you real pictures and videos of stainless steel laser cutting parts.
Packaging: Packaging assure to be 100% safe and stable.
After-sales Service: Once you receive the stainless steel laser cutting parts, please open the packaging and check all cargo within 7 days. If there are quality issues, we will arrange to remake or return money for you.
Packing & Shipping
Fine and safe packaging used for your products to assure no any damages during transportation.
1. Standard export packaging:
PE film coating+Waterproof plastic film+Wooden Pallet or Wooden Case;
2. Customized packaging as your request (Logo or other contents accepted to be printed on the packaging);
3. Other special packaging will be designed as customer’s request;
4. By International Express: DHL/UPS/FEDEX and our own express line;
5. By air or By sea.
FAQ:
- Q1: How can I get a sample to check your metal work quality?
Answer: After price confirmation, you can require for samples to check our quality. We will provide you sample for free.
Q2: How long can I expect to get the metal work sample?
Answer: After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 5-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.
Q3: What about the leading time for metal work mass production?
Answer: It depends on the order quantity. Normally, 15-30 days after your deposit.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.






