ANSI SUS316 CNC Laser Cutting Metal Prototype CNC Machining ODM
High-Quality CNC Laser Cutting Services For Prototypes And Production Parts
Products Description
Computer Numerical Control (CNC) laser cutting commonly uses optics, an assist gas, and a guidance system to direct and focus the laser beam into the workpiece. The many benefits of CNC laser cutting include: Speed. Less waste. Broad range of materials.
Details Photos
Our Services Process:
Quotation: We promise your inquiry of stainless steel laser cutting parts can be quoted within 6 hours as long as we confirm your drawing and requirements.
Sample Making: It is fastest within 3 days.
Mass Production: During production, we can give you updates by sending you real pictures and videos of stainless steel laser cutting parts.
Packaging: Packaging assure to be 100% safe and stable.
After-sales Service: Once you receive the stainless steel laser cutting parts, please open the packaging and check all cargo within 7 days. If there are quality issues, we will arrange to remake or return money for you.
Packing & Shipping
Fine and safe packaging used for your products to assure no any damages during transportation.
1. Standard export packaging:
PE film coating+Waterproof plastic film+Wooden Pallet or Wooden Case;
2. Customized packaging as your request (Logo or other contents accepted to be printed on the packaging);
3. Other special packaging will be designed as customer’s request;
4. By International Express: DHL/UPS/FEDEX and our own express line;
5. By air or By sea.
FAQ:
- Q1: How can I get a sample to check your metal work quality?
Answer: After price confirmation, you can require for samples to check our quality. We will provide you sample for free.
Q2: How long can I expect to get the metal work sample?
Answer: After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 5-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.
Q3: What about the leading time for metal work mass production?
Answer: It depends on the order quantity. Normally, 15-30 days after your deposit.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.






