Guangzhou XinFeng Engineering Machinery Co., Ltd.
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

E70B Original Swing Motor E70B Swing Reduction Gearbox For 099-6610

Price Negotiable
Price: Negotiable
MOQ: 1 Sets
Delivery Time: 3-5 days
Product Description

E70B Original Swing Motor E70B Swing Reduction Gearbox For 099-6610


Product Descri

 

         
Pos. Part No Qty Parts name Comments
1 099-6610 [1] SWING BEARING  
2 095-1299 [1] PIN, DOWEL  
3 096-6849 [55] BOLT  
4 093-2358 [1] GAUGE  
11-13. 099-6586 [1] AIR BREATHER ASSY.  
11 094-5570 [1] BREATHER  
12 094-5509 [1] SOCKET  
13 099-6587 [1] PIPE  
16 095-1463 [1] CONNECTOR  
17 085-5597 [1] SWING MOTOR  
18 8T-4139 [4] BOLT  
19 7X-0622 [4] WASHER  
20 096-5430 [1] 90 degrees ELBOW  
21 095-0968 [1] PLUG  
22 099-6588 [1] PIPE  
23 8T-7338 [18] BOLT  
24 099-6584 [6] SPACER  
  085-9309 [6] SPACER  
25 099-6551 [1] SWING GEAR  
26 093-0476 [2] PIN, DOWEL  
27 099-0240 [12] SPACER  
  085-9308 [12] SPACER  
28 099-6585 [1] PIPE  

 
None SWING DRIVE Parts scheme


About Xinfeng Machinery (XF) parts:
 

 
Maintenance method
1. The lubriing oil maintenance cycle of the rotary motor is 1000 hours. In daily operation, we need to observe the amount of rotary lubriing oil from the dipstick. In some cases, abnormal loss of lubriing oil will be found, so we need to open the large ring gear window. Check whether lubriing oil leaks into the large ring gear cavity through the sealing ring.

 

2. The general rotation gear inspection and lubriing oil replacement cycle is every 2000 hours or one year. The butter filling amount for a 20-ton machine is about 36 liters (two barrels). Periodically open the boom base and the square cover on the front of the frame. , to check the ring gear and lubriion conditions. For maintenance or if water is found, go to the X overhead cavity at the bottom of the excavator and open the cover to release the water.

 

3.There is a common misunderstanding among customers about the maintenance of slewing bearings. They believe that the lubriing oil of the slewing bearing is the same as the lubriion cycle of the big and small arms, and they need to be lubried every day. In fact, such actions have the opposite effect. If the lubriion cycle is too short, there will be too much lubriing oil in the bearing, which will burst the dust ring and leak out.



 
Advantages

 
Warehouse Display

Packaging and Delivery
 

 

FAQ
1. How to quickly and accurately buy products what lneeded?
A: Provide the original parts number to us to check.

2. How long have you been in the excavator
A: We are engaged in excavator parts since 1998


3. lfI don't know the part number,what shouldI do?
A: Please send us size and pictures of old products.

4. What is the warranty of the products?
A: The warranty is 6/12 Months based on the specific product.


5. How long is your delivery time?
A: The normal delivery time is 3-5 days for stock sproductsafter getting payment. lf not in stock, we will inform you thetime requlred.

6. Which shipping term you can supply?

A: By sea,air or by express ( DHL,Fedex,TNT,UPSEMS)


7. What is your MOQ?
A: Small order and sample order are acceptable


8. Do you have any After-Sales service?
A: Yes!Our

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou XinFeng Engineering Machinery Co., Ltd.
Location GuangZhou,CHINA(No.D01,YingFeng building,No1190.Zhongshan avenue central,tianhe district,Guangzhou.)
Contact Person Kane

Request A Quote

Please check your email address.
Your message must be at least 20 characters.