Guangzhou XinFeng Engineering Machinery Co., Ltd.
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

Excavator 320B Final Drive 11411357 114-1331 325B Travel Motor Assy For

Price Negotiable
Price: Negotiable
MOQ: 1 Sets
Delivery Time: 2-3 days
Product Description

Excavator 320B Final Drive 11411357 114-1331 325B Travel Motor Assy for

 

 

Pos. Part No Qty Parts name Comments
1 7Y-1434 [1] SPACER (40X69.5X6-MM THK)  
2 096-1773 B [1] SHIM (0.15-MM THK)  
  096-1774 B [1] SHIM (0.3-MM THK)  
  096-1775 B [1] SHIM (0.4-MM THK)  
  096-1776 B [1] SHIM (0.5-MM THK)  
  096-1777 B [1] SHIM (0.6-MM THK)  
  096-1778 B [1] SHIM (0.7-MM THK)  
  096-1779 B [1] SHIM (0.8-MM THK)  
  096-1780 B [1] SHIM (1-MM THK)  
  096-1781 B [1] SHIM (1.6-MM THK)  
3 114-1485 [1] HOUSING-MOTOR  
4 114-1497 [1] SEAL GP-DUO-CONE  
5 096-6412 [2] BALL BEARING  
6 114-1486 [1] HOUSING  
7 114-1539 [4] PIN-DOWEL  
8 7Y-1436 [1] GEAR-COUPLING  
9 6D-0692 [1] SEAL-O-RING  
10 7Y-1433 [1] CARRIER  
11 6V-5686 M [16] BOLT (M16X2X50-MM)  
12 7Y-0223 [3] SHAFT-PLANETARY  
13 094-1542 [6] BEARING-ROLLER  
14 7Y-1431 [3] GEAR-PLANETARY (30-TEETH)  
15 094-1528 [6] WASHER (53X84X1-MM THK)  
16 095-0891 [6] PIN-SPRING  
17 7Y-1428 [3] GEAR-PLANETARY (32-TEETH)(32 TEETH)  
18 094-0616 [3] BEARING AS-ROLLER  
19 3E-2338 [2] PLUG-PIPE  
20 7M-8485 [2] SEAL-O-RING  
21 7Y-1426 [1] COVER  
22 7Y-0225 [3] SHAFT-PLANETARY  
23 094-0611 [6] WASHER (47.3X76X1-MM THK)  
24 094-0580 [1] PLATE (10-MM THK)  
25 7Y-1427 [1] GEAR-SUN (14-TEETH)(11 TEETH)  
26 7Y-1430 [1] GEAR-SUN (17-TEETH)  
27 7Y-1558 [1] SPACER (90X119.6X7.5-MM THK)  
28 7Y-1432 [1] CARRIER  
29 7X-2568 M [16] BOLT (M20X2.5X180-MM)  
30 8T-4123 [16] WASHER (3.62X5.75X0.375-MM THK)  
31 1U-8846 B   SEALANT-GASKET  
32 095-1270 M [2] SETSCREW-SOCKET (M12X1.75X30-MM)  
33 7Y-1631 [1] GEAR-RING  
  B   USE AS REQUIRED  
  M   METRIC PART  

 

 

 

Undercarriage spare parts:
Track shoe, Track Link, Bolt, Track roller, Carrier Roller, Sprocket, Front Idler, Idler Cushion ......

Engine spare parts:
Engine assy,Cylinder Head,Cylinder Block,Turbocharger,Piston, Piston Ring, Metal, Crankshaft, Oil Pump, Fuel injection Pump,Water
Pump, Alternator, Starting Motor ......
Hydraulic spare parts:
Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder, Final Drive, Travel Motor, Swing Machinery, Swing Motor ......
Operator's Cab spare parts:
Cab Assy, Monitor, Controller, Engine Controller, Wiring Harness, Seat, Air Conditioner, Air Compressor......
Cooling parts:
Radiator, heat sink, air conditioner, compressor, after cooler , water cooler hydraulic oil cooler ......
Other parts:
Service kit, swing circle, engine hood, swivel joint, fuel tank, filter, boom, arm, bucket




About Xinfeng Machinery (XF) parts:
 

 
Maintenance method
1. The lubriing oil maintenance cycle of the rotary motor is 1000 hours. In daily operation, we need to observe the amount of rotary lubriing oil from the dipstick. In some cases, abnormal loss of lubriing oil will be found, so we need to open the large ring gear window. Check whether lubriing oil leaks into the large ring gear cavity through the sealing ring.
 
2. The general rotation gear inspection and lubriing oil replacement cycle is every 2000 hours or one year. The butter filling amount for a 20-ton machine is about 36 liters (two barrels). Periodically open the boom base and the square cover on the front of the frame. , to check the ring gear and lubriion conditions. For maintenance or if water is found, go to the X overhead cavity at the bottom of the excavator and open the cover to release the water.
 
3.There is a common misunderstanding among customers about the maintenance of slewing bearings. They believe that the lubriing oil of the slewing bearing is the same as the lubriion cycle of the big and small arms, and they need to be lubried every day. In fact, such actions have the opposite effect. If the lubriion cycle is too short, there will be too much lubriing oil in the bearing, which will burst the dust ring and leak out.

Service

1. Consulting services: Provide professional opinions and suggestions to help customers solve business problems and formulate strategic plans.
2. Query service: Customers provide part numbers and we can accurately query the exploded view and model.
3. Technical service: Engineers can solve all problems related to the excavator, determine component failures, and then tell customers how to solve the problem.


Advantages

 
Warehouse Display

Packaging and Delivery
 

 

FAQ
1. How to quickly and accurately buy products what lneeded?
A: Provide the original parts number to us to check.


2. How long have you been in the excavator
A: We are engaged in excavator parts since 1998


3. lfI don't know the part number,what shouldI do?
A: Please send us size and pictures of old products.


4. What is the warranty of the products?
A: The warranty is 6/12 Months based on the specific product.


5. How long is your delivery time?
A: The normal delivery time is 3-5 days for stock sproductsafter getting payment. lf not in stock, we will inform you thetime requlred.


6. Which shipping term you can supply?

A: By sea,air or by express ( DHL,Fedex,TNT,UPSEMS)


7. What is your MOQ?
A: Small order and sample order are acceptable


8. Do you have any After-Sales service?
A: Yes!Our


 
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou XinFeng Engineering Machinery Co., Ltd.
Location GuangZhou,CHINA(No.D01,YingFeng building,No1190.Zhongshan avenue central,tianhe district,Guangzhou.)
Contact Person Kane

Request A Quote

Please check your email address.
Your message must be at least 20 characters.