excavator dozer parts front idler 6t-2614 bulldozer adjuster front idler roller t200 d3g d4d d6 d6h d8r d11n d65 320d 32
Products Features
|
Material
|
50Mn |
| Finish | Smooth |
| Colors | Yellow/Black/Other |
| Technique | Forging / casting |
| Surface Hardness | HRC52-58,deepth:8mm-12mm |
| Warranty time | 6 months |
| Certification | ISO9001 |
| Delivery Time | Within 3 days after contract established |
1. The broadly optional guiding wheel suits for Excavator machine and special machinery ranging from 3 to 50 tons
2. It includes such types as casting ,welding and manufacturing ,etc
3. The special heat treatment technology prolongs the service life and makes it endure the heavy load and prevent smash to a
maximum extent



Other machinery and models are available
| IDLER | |
| PC200 | 20Y-30-00030/KM-1642 |
| cat320 | 113-2907/102-8151/CR5732 |
| E325 | 7Y0360 |
| cat330/E336 | 1028152 |
| cat345 | 115-6366/CR-6597 |
| cat385 EC700B/EC650 | CR6380/102-8136/135-8904/194-1157/248-7257/7Y-0856 |
| ZX200/240 | 9176864/9242964 |
| SK200-3 | 24100N5948F2 |
| EC290C | 14589914 |
| EC290B | 1181-00721/14510972 |
| EX200-5 | 9145269/ID-1816 |
| PC300/360 | 207-30-00160/KM-2018 |
| PC400/PC450 | 208-30-00201 |
| PC650-8 | KM3060/21M-30-00301/21M-30-0030A |
| R290 | 81EH-10050/81E8-2004/57407314/PV9544B0M00 |
| R305 | 81N8-13010 / V81N8-13010V |
| SH400 | KTA1268Z-C |
| VI030-1A | 172458-37061 |
| PC35R-8 VIO40 VIO30 PC03 PC05 PC15MR PC10MR PC20MR PC30MR PC35R PC650-8 SK20SR SK40SR SK50UR | |
| EX25-1 EX60-5 EX300-5 ZX330 ZAX360-5G EX400-1/ZX450 Short York ZAX450/ZAX470 Long York ZX870 | |
Production Flow Processing and inspection
1. Material pretreatment: Preprocess the steel alloy or manganese steel materials required for the excavator wheel hub to remove impurities and impure substances to ensure the purity and plasticity of the material.
2. Heat treatment: The pretreated material is subjected to multiple steps such as high-temperature heating, insulation, and cooling. The structure and performance of the material are improved through the heat treatment process, and the strength and hardness of the wheel hub are increased.
3. Forging processing: The heat-treated material is forged into shape. After the material is heated, hammering, extrusion, stretching and other operations are performed, and the blank is finally forged into a precise wheel hub shape.
4. Machining: Process the forged wheel hub blank, including fine machining processes such as surface processing, holes, gears and splines.
5. Heat treatment again: The processed wheel hub is subjected to high-temperature heat treatment to make the wheel hub surface have high hardness and high strength, ensuring the reliability and durability of the wheel hub in high load and high-speed environments.
6. Spray painting: The manufactured wheel hubs are treated with protective coatings such as powder spraying to ensure the anti-corrosion and aesthetics of the wheel hub surface.
Company Strength

Guangzhou Haofeng Scm Co., Ltd. is located in Nansha District, Guangzhou.Our company is a professional supplier of machinery parts, suitable for , Hitachi, Hyundai, Kobelco, Komatsu and other brands.We are committed to providing used excavator, excavator parts and Customized mechanical accessory. We have a large independent factory,100 employees, 15 sets of equipment and 4 production lines. We are both a supplier and manufacturer of mechanical engineering accessories.Our goods are delivered directly from the factory to customers with low price and good quality.


Customer Photos
Packaging And Shipping

FAQ
Q: Why should you buy from us not from other suppliers?
A:We have two companies and one factory, the price and quality are very advantageous. Our team has 20 years of experience in the machinery industry.
Q: How long is your delivery time?
A: Generally it is 10 days if the goods are in stock. or it is 20-30 days if not in stock. If it is customized,it will be confirmed accord ing to order.
Q: What about Quality Control?
A:We have excellent tester, check every piece to ensure the quality is good, and check the quantity is correct before the shipment.
Q: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery,Terms Trade have CIF ,CFR,FOB,etc.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

