ZX200 excavator bucket H link 1027222 Heavy Equipment ZX120 ZX330 ZX450 Excavator Bucket Link with Bushing 8076541
Track Link Guard, Bucket Link, Bucket H Link
|
H Link
|
|||
|
Description
|
H Link
|
Material
|
Iron
|
|
Used For
|
Excavator Buckets
|
Color
|
Yellow/Red/Blue/Grey
|
|
Model
|
PC200/PC300/PC400/E320/DH220/DH300/EC210 etc
|
Horse head*Thickness
|
130*3.0/90; 160*4.0/130; 160*4.0/120; 133*3.0/90
|
|
Weight
|
Depends on different models
|
MOQ
|
1 PC
|
|
Package
|
Neutral Packing
|
Payment
|
T/T, Trade Assurance, Company Bank Account, Credit Card,etc.
|





Production Flow Processing and inspection
2. Cutting: Cut the selected material according to the size required by the design.
3. Rough machining: Use processing equipment such as lathes for rough machining to initially shape the connecting rod.
4. Heat treatment: Heat treatment is performed on the connecting rod to improve the mechanical properties of its material.
5. Finishing: Use lathes, grinders and other equipment for finishing, so that the connecting rod reaches the accuracy and surface finish required by the design.
6. Assembly: Assemble the processed connecting rod with other parts to form a complete mechanical device.
7. Inspection: Conduct quality inspection on the assembled connecting rod to check whether its size, shape and surface quality meet the requirements.
Company Strength

Guangzhou Haofeng Scm Co., Ltd. is located in Nansha District, Guangzhou.Our company is a professional supplier of machinery parts, suitable for , Hitachi, Hyundai, Kobelco, Komatsu and other brands.We are committed to providing used excavator, excavator parts and Customized mechanical accessory. We have a large independent factory,100 employees, 15 sets of equipment and 4 production lines. We are both a supplier and manufacturer of mechanical engineering accessories.Our goods are delivered directly from the factory to customers with low price and good quality.


Customer Photos
Packaging And Shipping

FAQ
Q: Why should you buy from us not from other suppliers?
A:We have two companies and one factory, the price and quality are very advantageous. Our team has 20 years of experience in the machinery industry.
Q: How long is your delivery time?
A: Generally it is 10 days if the goods are in stock. or it is 20-30 days if not in stock. If it is customized,it will be confirmed accord ing to order.
Q: What about Quality Control?
A:We have excellent tester, check every piece to ensure the quality is good, and check the quantity is correct before the shipment.
Q: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery,Terms Trade have CIF ,CFR,FOB,etc.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

