Guangzhou GENY Electric Co., Ltd
                                                                                                           
Verified Supplier
39 Years
Since 1987
Menu

YCCl-9901 Phase and Feeder Identifier for Transformer Testing - 220V AC, 500A Clamp Range, 5km Pulse Distance

Price Negotiable
Price: negotiate rates
MOQ: 1
Delivery Time: 6~8weeks
Brand: GENY
Product Description
YCCl-9901 Phase and Feeder Identifier
The YCCl-9901 Phase and Feeder Identifier is a professional testing instrument designed for transformer management systems. It accurately identifies user information including transformer connections, power lines, and phase configurations, providing an effective solution for electrical distribution network management.
Key Features
  • Dual identification methods: pulse method and powerline carrier signal method
  • High testing accuracy with no misjudgment or unrecognized users
  • Transformer and phase identification for measured lines
  • Load identification for each transformer phase
  • Voltage measurement and harmonic analysis (3rd-51st harmonics)
  • Branch line identification and distribution area testing
  • Comprehensive electrical parameter display including voltage, current, angle, power, and power factor
  • Flexible clamp options: 5A (7mm), 500A (80mm), and optional flexible clamps
Technical Specifications
Parameter Specification
Operating Voltage (Host) AC 3 × 220V
Terminals AC220V
Clamp Current Transformer Range 5A (7mm), 500A (80mm) | Flexible Clamp: Optional
Frequency 50Hz
Operating Temperature -10°C ~ +45°C
Host Power Consumption <2W/phase
Terminal Power Consumption <1W (when no pulse sending)
Terminal Maximum Pulse Current 10A
Operating Distance (Carrier) <2.7km
Operating Distance (Pulse) >5km
System Configuration
The system consists of a host testing device installed on the low-voltage side of the transformer and handheld testing units used at the user side for information identification. Both methods can be used in combination or separately for maximum flexibility.
Operation Guidelines
Host Machine Connection
Connect the testing conductors (yellow, green, red, and black wires) with UA, UB, UC, UO terminals respectively. The other side connects to the transformer or power supply device using clamps. Default color coding: yellow = phase A, green = phase B, red = phase C, black = UO.
Extension Unit Connection
Use the plug side of the testing pen to connect to the extension panel terminal and the clamp side to connect to the power meter (red = phase line, black = zero line). Power on after completing all connections.
Important: Always follow electrical safety rules and wiring regulations during operation to ensure personnel safety and equipment protection.
YCCl-9901 Phase and Feeder Identifier testing equipment with host unit and handheld devices

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou GENY Electric Co., Ltd
Location ROOM 107, 1ST FLOOR, No. 602 GUANGSHAN ER ROAD, TIANHE DISTRICT, GUANGZHOU, CHINA POSTCODE: 510663
Contact Person John Shen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.