Langfang Hongyuqiao Waterproof Material Co., Ltd.
                                                                                                           
Verified Supplier
22 Years
Since 2004
Menu

Industrial Acrylic Waterproofing Material For Tunnels Basements And Swimming Pools

Price Negotiable
Price: Negotiation
MOQ: 1000KG
Delivery Time: 10 Days
Brand: HONGYUQIAO
Product Description
Waterproof Coating Description
Acrylic Waterproofing Materials Swimming Pools Tunnels Basements Building Wall And Floor Roof Paint Waterproof Coating
 
Polyurethane waterproof coating is a environment friendly elastic waterproof coating ,its basal component is polyether polyol.
 
waterproof coating Specification
 
Product Name  Waterproof Paint Waterproof Material
Size 20kg/barrel
Color Transparent, blue,red , black ,or customized
Application Building roof,bathroom, pool, wall waterproof, repair engineering
waterproof coating Features
1 Excellent tensile strength and high elasticity,well-adapted to the substrate shrinkage and deformation.
2 Easy to apply, and shorten the construction period.
3 It is safe and environment friendly , tasteless , non-toxic.
4 Colorful,and it can be customized as requirement.
Applications
1 Wall surface, basement, tunnel, kitchen, swimming pool, subway, bathroom and so on.
2 Especially used for the place where the shape is complex and irregular.
 
Installation Instructions
Protective clothing : rubber gloves ,goggles ,protective clothing and dust mask .
Tool : roller or brush or airless spray .
1. Substrate should be clean , flat and free from grease oil , dust or laitance . you can brush a little water to keep surface moist ,easy to construction ,and moisture content should less than 5%.
2.Brush directly after stirring the material evenly .(If the waterproof coating is too dense , you can add water. )
3. The waterproof coating need to brush 3-4 layers ,and recommend that the thickness should be not beyond 0.6mm at per coating film.
1.0mm ≤the total thickness ≤2.0mm, the regular thickness is 1.5mm .
1). Bruch a very thin layer , then lay the non-woven fabric , after the first layer is not glue the hand ,then brush the second layer , And the second should be at right angle to the first layer.
2). After the send layer of coating is not glue the hand or is curing , brush the third layer , the third layer is also at right angle to the second layer.
4. If necessary,add polypropylene fabric as reinforcement during the installation is better . Without PP fabric is also OK .
 
 
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Langfang Hongyuqiao Waterproof Material Co., Ltd.
Location Hongyuqiao Waterproofing, Floor 15, Building 16, Dawayao Middle Road, Fengtai District, Beijing
Contact Person Di

Request A Quote

Please check your email address.
Your message must be at least 20 characters.