Fujian zhichuan mechanical equipment Co., Ltd.
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

SUN NFBC-LCN Cartridge Valve Unlock the Full Potential of Your Hydraulic System with Precision Contro

Price Negotiable
Price: RMB100-1000/PC
MOQ: 1pc
Delivery Time: 3work days
Brand: SUN hydraforce
Product Description

SUN hydraforce NFBC-LCN

1. The working principle of the cartridge valve is to control the opening or closing of the oil port of the main oil circuit through the control port. The movement of the main valve spool determines the on-off state of the main oil circuit.


2. Select different pilot valves to achieve pressure control, direction control or flow control, or combine these functions to achieve complex control requirements.


3. When the control oil port is connected to the fuel tank, the pressure can be relieved or pressurized through the pilot control valve, so as to control the opening and closing of the taper valve.


4. Combine the cone valve with the small flow solenoid valve to form the direction control valve. A variety of pressure control valves can be formed by combining the taper valve with different types of pilot pressure valves.


5. By combining the taper valve with the solenoid valve and the pilot pressure valve, or adopting speed regulation measures, the reversing, pressure control or throttling functions can be realized in the system.

Brand SUN
Type NFBC-LCN
Operating voltage 220V
Size 63
Shaft Diameter 5mm
Speed 3000 RPM
Weight 2.3kg
Power Source Electric
Operating Temperature -20°C to 80°C
Material Steel
Current 1.5A

 

 

FAQ

Q1: Wonder if you accept small orders?
A1: Do not worry. Feel free to contact us .in order to get more orders and give our clients more convener ,we accept small order.

 

Q2: Can you send products to my country?
A2: Sure, we can. If you do not have your own ship forwarder, we can help you.

 

Q3: What's your payment terms ?
A3: By T/T,LC AT SIGHT,100% full payment.

 

Q4: How long is your production lead time?
A4:It depends on product and order qty. Normally, it takes us 15 days for an order with MOQ qty.

 

Q5: When can I get the quotation ?
A5: We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation.Please call us or tell us in your mail, so that we could regard your inquiry priority.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Fujian zhichuan mechanical equipment Co., Ltd.
Location No. 906, Jinlong Road, Guankou Town, Jimei District, Xiamen City
Contact Person li

Request A Quote

Please check your email address.
Your message must be at least 20 characters.