Toyota Prius V 2012~2017 Ni-MH 7.2V 6.5AH Prismatic Hybrid Car Battery
Price:
Negotiable
MOQ:
1 set
Delivery Time:
3~20 working days
Brand:
YASTE
Product Description
Toyota Prius V 2012~2017 Ni-MH 7.2V 6.5AH Prismatic Hybrid Car Battery
PRODUCT HIGHLIGHTS
| Model Name | For Prius V Hybrid Battery |
| Voltage | 7.2V Hybrid Battery |
| Capacity | 6500mAh |
| Color | Grey |
| Shipping Time | 3~20 working days |
| MOQ | 1 Set |
Our 2012, 2013, 2014, 2015, or 2016 Toyota Prius V Hybrid Battery is very efficient and durable for demanding driving conditions. Our Toyota Hybrid Batteries were designed to deliver years of steady performance in more demanding environments. These third generation Toyota Prius vehicles have become a common choice for fleet owners, taxi cab drivers, and car-poolers. Each replacement 2012-2016 Toyota Prius V Hybrid Battery is ready to meet the demands of any of these jobs.
Shop with Yaste, for all your replacement hybrid battery needs. Get a quote from best Hybrid Batteries today!
Advantage of Yaste hybrid car battery aftermarket
- All with class A new cell, contains 14 modules
- Each battery module is 100% tested to ensure the optimal performance
- Entire battery pack is balance for consistent efficient
- Better heat disipation, better fuel economy
- 3 years or 100,000km whichever comes first
- Works smoothly in different weather condition
- Compatible with a wide range of vehicles with cost-effective
YASTE Laboratory Test Data
- Performance of different discharge rate
Battery test (Free trainning)
- For stock hybrid car battery maintanence
- For hybrid car Battery performance test
- For hybrid car battery balancing
- For used hybrid car battery selecting
Packaging
Carton Size: 16.93*13.39*7.09 inch*2 Carton (Packaging consists of cardboard boxes and foam. Relevant wiring harness will be package by small boxes)
1 Pallet(1.1*1.1m) can load 36 cartons.
1 20' container can load 480 cartions.
Payment & Delivery
- TT, Credit Card, PayPal, USDT
- Delivered by UPS, DHL, TNT, EMS or local truck by terms of FOB, CIF, DDU and DDP.
- Shipping time is 4~7 days by express, 15~45 days by sea, and 30~65 days by local truck.
Q&A
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shenzhen Yaste Tech Co., Ltd.
Location
Fl2, Bairuida Building A, Bantian Street, Longgang District, Shenzhen, Guangdong, China
Contact Person
Karray








