Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

Steel Bailey Bridge S355JR 3000mm Panel Single Lane Temporary Bridge with HS-25 Load Capacity

Price Negotiable
Price: FOB1000USD
MOQ: 1set
Delivery Time: 15days
Brand: Tongkai
Product Description
Steel Bailey Bridge Overview
Bailey Bridge is a globally recognized standard bridge system featuring simple structure, convenient transport, rapid assembly, and easy disassembly. Engineered for heavy loading capacity, exceptional stability, and long fatigue life, this temporary bridge solution offers flexible span configurations, loading capacities, and mixed forms suitable for various applications.
Technical Specifications
Parameter Specification
Standards ASTM, GB, BS
Material Grades S355JR, S460J0
Panel Dimensions 3000/3048mm × 1500mm × 176mm
Footway Options Single or double side, 1m, 1.2m & 1.5m
Design Loads HS-15, HS-20, HS-25, Pedrail-50
Applications Road Construction, Railway Construction, Emergency Usage, Military Usage
Bridge Components
Panel Structure
Monolithic welded units with 3000mm/3048mm hole-to-hole spacing and 1500mm height. Features interlocking male/female lugs for panel pin connection and 4 transom seats per bottom chord.
Joint Systems
  • Transom Clamp: Screw lock clamp securing transom to panel (3.0kg)
  • Sway Brace: Diagonal bracing under roadway (33kg)
  • Rakers: Vertical stabilization from panel top to transom (11kg)
Decking System
Comprising transoms (18ft long, 10in high, 4.5in wide) and decks (3042×1050mm), secured with U-bolts and L-bolts.
End System
Includes End Male Post, Female End Post, Tie Beam, Bearing and Bearing Plate.
Launching Equipment
Nose assembly, rollers (25t max load), rock rollers (6t), joints, bolts, and specialized spanners.
Erection Methods
Cantilever Launching Method and Crane Lifting for flexible installation according to site conditions.
Product Images
Steel Bailey Bridge panel structure and assembly details Bailey Bridge installation and deployment in field conditions

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Location Room 202, Jintai Building, Runxing Road,High tech Zone, Zhenjiang Jiangsu, China
Contact Person Andy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.