ASTM A192 A179 A178 Pipe Carbon Steel Seamless Tube For High Pressure
Price:
Negotiable
MOQ:
1
Delivery Time:
7~30 working days
Brand:
BaoYang
Product Description
| Parameter | Description |
|---|---|
| Grades | ASTM A192, A179, A178 |
| Material | Carbon Steel (Seamless) |
| Standard | ASTM A192, ASTM A179, ASTM A178 |
| Size Range | Various diameters and wall thicknesses as per ASTM standards |
| Length | Standard lengths, customizable upon request |
| Ends | Plain ends, beveled ends, threaded, or socket-weld ends |
| Surface Treatment | As-rolled, annealed, or normalized |
| Property | ASTM A192/A179/A178 Requirement |
|---|---|
| Tensile Strength | ≥415 MPa (60,000 psi) for all grades |
| Yield Strength | ≥240 MPa (35,000 psi) for A192, varies for A179 and A178 based on specific product forms |
| Elongation | ≥20% in 50 mm (2 in) for A192, varies for A179 and A178 based on product forms |
| Hardness | Varies depending on heat treatment and specific grade |
| Element | Typical Range (%) for ASTM A192/A179/A178 |
|---|---|
| Carbon | 0.15 - 0.30 |
| Manganese | 0.35 - 0.60 |
| Phosphorus | ≤ 0.025 |
| Sulfur | ≤ 0.025 |
| Silicon | ≤ 0.35 |
- Boiler Tubes: Used in power and industrial boilers for steam generation.
- Superheater Tubes: Employed in superheater sections of steam power plants to raise steam temperature.
- Heat Exchangers: Suitable for use in shell and tube heat exchangers operating under high pressure.
- Pressure Vessels: Utilized in the construction of high-pressure vessels and reactors.
- Refineries: Ideal for high-temperature and high-pressure pipelines in oil refineries.
- ASTM A192: Specifies requirements for seamless carbon steel boiler tubes for high-pressure service.
- ASTM A179: Covers minimum-wall-thickness, seamless cold-drawn low-carbon steel boiler and superheater tubes.
- ASTM A178: Specifies the requirements for electric-resistance-welded (ERW) carbon steel boiler and superheater tubes.

Company Profile

Factory Tour

team introduction

Applications

Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Cangzhou Baoyang Pipeline Equipment Co., Ltd.
Location
Room 512, Block B, Tiancheng Building, Yunhe District, Cangzhou City
Contact Person
Amy