ASTM A178 A179 A192 High Pressure Boiler Steel Pipe Carbon Steel Cold Drawn
Price:
Negotiable
MOQ:
1
Delivery Time:
7~30 working days
Brand:
BaoYang
Product Description
| Parameter | Description |
|---|---|
| Grades | ASTM A178, A179, A192 |
| Material | Seamless Carbon Steel |
| Standard | ASTM A178, ASTM A179, ASTM A192 |
| Size Range | Various diameters and wall thicknesses as per ASTM standards |
| Length | Standard lengths, customizable upon request |
| Ends | Plain ends, beveled ends, threaded, or socket-weld ends |
| Surface Treatment | As-rolled, annealed, or normalized |
| Property | ASTM A178/A179/A192 Requirement |
|---|---|
| Tensile Strength | ≥415 MPa (60,000 psi) for all grades |
| Yield Strength | ≥240 MPa (35,000 psi) for A178, varies for A179 and A192 based on product forms |
| Elongation | ≥20% in 50 mm (2 in) for A178, varies for A179 and A192 based on product forms |
| Hardness | Varies depending on heat treatment and specific grade |
| Element | Typical Range (%) for ASTM A178/A179/A192 |
|---|---|
| Carbon | 0.15 - 0.30 |
| Manganese | 0.35 - 0.60 |
| Phosphorus | ≤ 0.025 |
| Sulfur | ≤ 0.025 |
| Silicon | ≤ 0.35 |
- Boiler Tubes: Used in power and industrial boilers for steam generation.
- Superheater Tubes: Employed in the superheater sections of steam power plants to increase steam temperature.
- Heat Exchangers: Suitable for use in heat exchangers operating under high pressure and temperature.
- Pressure Vessels: Ideal for construction of high-pressure vessels and reactors in petrochemical and refining industries.
- ASTM A178: Specifies requirements for electric-resistance-welded (ERW) carbon steel boiler and superheater tubes.
- ASTM A179: Covers minimum-wall-thickness, seamless cold-drawn low-carbon steel boiler and superheater tubes.
- ASTM A192: Specifies the requirements for seamless ferritic and austenitic-ferritic alloy-steel boiler, superheater, and heat-exchanger tubes.
Company Profile

Factory Tour

team introduction

Applications

Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Cangzhou Baoyang Pipeline Equipment Co., Ltd.
Location
Room 512, Block B, Tiancheng Building, Yunhe District, Cangzhou City
Contact Person
Amy


