Bucket type Concrete Mixing Plant 100m3/h Stationary Concrete Batching Plant
High Efficiency 60m3/h Stationary Concrete Batching Plant Concrete Mixing Plant
Belt Conveyor Type Concrete Batching Plant mainly consists of 5 major systems such as mixer, material weighing system, material conveying system, material storage system and control system and other ancillary facilities. It is equipped with the storage, batching, conveying, stirring, control and other devices of various raw materials required for precast concrete, and various aggregates, powders, admixtures, water, etc. A complete set of equipment for supplying concrete in a concentrated manner than by a mixer.
pecification
| Model | HZS35 | HZS50 | HZS75 | HZS100 |
| Production in Theory (m3/h) | 35 | 50 | 75 | 100 |
| Mixer Type | JS750 | JS1000 | JS1500 | JS2000 |
| Mixing Motor Power (KW) | 2×15 | 2×18.5 | 2×30 | 2×37 |
| Cycle time(S) | 60 | 60 | 60 | 60 |
| Mixer Discharging Volume(L) | 750 | 1000 | 1500 | 2000 |
| Maximum Particle Size of Aggregate(mm) | 60 | 60 | 60 | 80 |
| Batching Volume(L) | 1200 | 1600 | 2400 | 3200 |
| Aggregate Species | 2-3 | 2-4 | 4 | 4 |
| Aggregate lifting motor power(kw) | 7.5 | 15 | 18.5 | 22 |
| Discharging Height (m) | 4 | 4 | 4 | 4 |
| Installed Capacity(KW) | 50 | 70 | 110 | 120 |
Features of bucket type concrete batching plant:
1. It adopts a combined structure and unitized module, which allows for quick and convenient installation and demolition.
2. The unloading angle of the aggregate bin has been increased to solve the problem of difficulties in unloading caused by rain.
3. The use of cylinder discharge or electric push rod makes it convenient and quick to discharge materials.
4. The overall steel structure of the mixing station is constructed with high-quality steel, providing strong structural strength and stability.
5. The mixing machine utilizes a twin-shaft forced mixing main machine, delivering strong mixing performance, uniformity, and high productivity.
6. Excellent pneumatic components, electrical components, etc., are employed to ensure equipment reliability and accurate metering performance.
7. Each maintenance and repair site is equipped with a walking platform or check ladder, offering sufficient operation space for easy maintenance and repair.
8. Environmental protection measures include energy-saving features such as pulse dust removal system and recycling waste-water for reuse.
A:12 months warranty for main parts since departure. On-site installation, debugging, workers training. Make sure that your workers operate properly and know daily maintenance well. Q:What’s your delivery time?
A:The goods will be delivered in 30-45 days after the 30% of the total amout is paid as deposit, and maybe a little longer if busy in the factory.
B: Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
A: You could email us the photos to show what happens or call us, and our service line is available 24/7, and then we will
feedback you immediately. Also on-site technician service available as request.
A:Our engineer will make installation drawing before we send the machine, and our engineer will go oversea to guide and train the installation after everything is already set in customer's construction site.
A: Yes, we have. It is our patent products, certificated by CE.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
