Zhengzhou Sinolion Machinery Co., Ltd.
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

Mobile Trommel Gold Washing Plant for Alluvial Gold Processing Line Mining Equipment

Price Negotiable
Price: $7,750.00/sets
MOQ: 1 unit
Delivery Time: Negotiable
Brand: ZHENGZHOU Sinolion
Product Description
Product Description
The mini gold screen equipment is mainly used in dry land beach, river is a gravity processing equipment is mainly used in sand gold ore and the recovery of monomer gold in the vein.it can be easily movable on land, it has a compact structure, strong integrity, light weight, large handling capacity, simple operation, reliable work, and easy maintenance, easy to move and so on.The processing capacity of this equipment can reach 30-50t/h per hour, which is suitable for mineral processing sites, and the recovery rate of screened gold can reach 90%.
Gold Mobile Trommel Screen 1225 can be washing and screening.When the alluvial gold and placer gold enter the drum device, due to the incline and rotation of the drum device, the materials on the screen surface are flipped and rolled, so that the qualified materials are discharged through the outlet at the bottom of the rear end of the drum, and the unqualified materials are discharged through the outlet at the rear end of the drum. Discharge from the discharge port.
The screen is divided into two parts, the first half is smaller than 5mm, and the second half is larger than 5mm.Can better screen materials.The water pipes are distributed on the outside, which can better flush the materials in the barrel and prevent clogging.The water pipes are distributed on the outside, which can better enter and exit the materials and flush the materials in the barrel to prevent clogging. The water pipes are galvanized seamless pipes or round steel, which can solve the problem of non-durable water pipes and greatly improve the service life of the fuselage.The frame on the outside of the screen drum can effectively prevent the screen drum from moving backward during operation.

There is a workbench at the feed inlet of GMTS1225, and a ladder on one side of the workbench. Workers can stand on the workbench through the ladder to observe the unloading situation at the feed inlet, which can better cooperate with the work of the equipment.The equipment is equipped with traction and 4 tires, which can move the equipment anywhere and anytime, which is very
convenient and fast.

Products Details
Specifications
Model
GMTS-1200x2500
Drum Diameter
1200mm
Drum Length
2500 mm
Towing Hook
Include
Mixing section length
400mm
Rubber Tires Quantity
4 pieces
Spray Pipe Material
Galvanized seamless pipe
Capacity
30-50 tons/hour
Engine
Diesel engine
Electric motor
Sluice Box
1000x6000mm
Grizzly
Steel bar diameter 20-30mm
Bar spacing 30mm
Input hopper: 1.3m³
Packing & Delivery
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
Certifications
Company Profile
Sincerely welcome to send your inquiry, you can get best quotation and professional service!
FAQ
Q1: How long is the delivery time?
A: Normally within 7-10days

Q2:What equipment do you build?
A: Specialized in alluvial / placer gold / diamond mining equipment.

Q3: How long is the warranty period?
A:One year

Q4: Do you have a certificate of origin, EU certification, etc.?
A: yes, of course

Q5: How many wheels does it have?
A:There are two and four rounds, according to customer requirements.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhengzhou Sinolion Machinery Co., Ltd.
Location No. 324 Nanyang Road, Zhengzhou, Henan, China
Contact Person Cai

Request A Quote

Please check your email address.
Your message must be at least 20 characters.