Xi'an Brictec Engineering Co., Ltd.
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

Building Process in Malaysia CBT Project Decorative Brick Making Machine Production Line with Multi-Bucket Excavator

Price Negotiable
Price: Negotiable
MOQ: 1 set
Delivery Time: 60 days
Brand: Brictec
Product Description

The CBT decorative brick production line project in Malaysia

These pictures were taken on site during our construction project of a brick factory in Malaysia CBT.

On July 8, 2024, the Malaysia CBT project lunch ceremony was held by Xi’an Brictec successfully, the main purpose of which is to arrange the project constructing schedule and the project personnel duties, and to define the working responsibilities.

The CBT decorative brick production line project in Malaysia is a Southeast Asian model brick factory project that Xi'an Ruitai will focus on building in 2024. According to the project production process, the production line is designed to produce 70,000 decorative bricks (215x100x67mm) per day. Since the molding shift is 6 days/week, the actual molding control daily output is about 85,000 pieces.

Main processes of the CBT decorative brick factory production line project in Malaysia:

The project adopts wet plastic extrusion molding process for molding, single-layer tunnel drying room with support bar circulation for drying, and lightweight mullite flat ceiling external combustion tunnel kiln for firing. The operating equipment can be automatically controlled. The drying room and tunnel kiln are centrally controlled.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xi'an Brictec Engineering Co., Ltd.
Location China
Contact Person Brandon Lan

Request A Quote

Please check your email address.
Your message must be at least 20 characters.