Dongguan Chuangrui New Energy Co., Ltd
                                                                                                           
Verified Supplier
21 Years
Since 2005
Menu

Test Equipment Switching Power Supply ATE Automated Testing Machine 14BIT OEM

Price Negotiable
Price: to be discussed
MOQ: one set
Delivery Time: 2 to 3 weeks
Brand: Topfer
Product Description

Test Equipment Switching Power Supply ATE Automated Testing Machine 14BIT OEM
 
Features of the Switching Power Supply Automatic Testing System TopFer 6600:
• High Efficiency
      The system adopts a synchronous parallel testing architecture, which is approximately 3-4 times faster than traditional ATS systems.
 
• Strong System Stability
      Components such as AC Source and electronic loads exhibit excellent stability and reliability.
 
• High Accuracy
      DC, 14-BIT, 100% analog simulation of various inputs, with an accuracy of 0.02% + 0.02% F.
 
• Extensibility
       Through 10 sets of Extended Measurement, the switching power supply automatic testing system can measure internal AC and DC voltage simulations on PCBs.
 
• Statistical Analysis Capability
        Comprehensive analysis of test results and generation of analytical charts, providing real-time process deviation warnings.
 
Advantages of the TopFer 6600 Switching Power Supply Automatic Testing System:
      • Suitable for testing applications of AC/DC Power Supplies and DC/DC Converters.
      • High extensibility, easily integrating standardized interface testers.
      • Fast testing speed, 3-4 times faster than traditional ATS systems.
      • Open system platform, allowing for self-edited test steps according to requirements.
      • Standardized instrument control interface and graphical operating environment (Windows interface).
      • The TopFer 6600 switching power supply ATE provides report design and statistical analysis capabilities.
 
 
Test Items for the Switching Power Supply Testing System :

Test itemsTest items
Measuring under LED.ModeTracking
DC Current under C.V.ModeShort circuit test
Peak-Peak noiseShort circuit current
Current peak-Peak noiseOV protection
Voltage peak-Peak noiseUV protection
Transient response timeOL protection
Transient spikeOP protection
Voltage regulationIn-test adjustment
Current regulationAC cycle drop out
Turn ON timePLD simulation
Rise timeGPIB read/write
Fall time232 read/write
Hold-up timeUSB read/write
Inrush current testTTL signal control
Power good signalRelay control
Power fail signalBar code scan
P/S ON signalDynamic test
Power up sequenceSpecification under C.P.Mode
Power off sequenceDC output current
EffciencyDC output voltage
Input RMS currentCurrent Ripple test
Input powerDimming Current
Input power factorDimming frequency
Input voltage rampDimming period
Input freq. ramp 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Chuangrui New Energy Co., Ltd
Location Room 5072, Unit 1, Building 1, No. 2, Nancheng Section, Tiyu Road, Nancheng Street, Dongguan City, Guangdong Province
Contact Person Zou Weimin

Request A Quote

Please check your email address.
Your message must be at least 20 characters.