Dongguan Chuangrui New Energy Co., Ltd
                                                                                                           
Verified Supplier
21 Years
Since 2005
Menu

10KW Inverter Test System Eol Test Equipment IEEE1547 Standard

Price Negotiable
Price: to be discussed
MOQ: one set
Delivery Time: 6 to 7 weeks
Brand: Topfer
Product Description

10KW Inverter Test System / Safe, Efficient, And Highly Stable 10KW

 

Introduction:

       The  Inverter Test System is specifically designed for testing the electrical characteristics of various photovoltaic inverters and new energy products, as well as islanding protection tests. It is an essential testing tool for production workshops, laboratories, installation and commissioning, and research and development. TheTest System features specially developed and optimized standard test projects for photovoltaic inverters, meeting the preliminary electrical testing requirements of IEEE1547, 1547.1, UL1741, and China's National Standard GB/T19939.

 

Features:

  1. An open hardware platform that allows for the addition of various testing devices based on actual test requirements.
  2. Supports comprehensive testing of new electrical energy technologies such as islanding effect, photovoltaic inverters, and communication power supplies.
  3. Supports system composition of local area networks and remote network scheduling and control.
  4. Meets the relevant requirements of IEC62116 "Test Methods for Islanding Prevention for Photovoltaic Inverters Used in Utility Interfaced Systems."
  5. An open software platform that can be expanded with various new test projects and functions based on customer testing requirements.

Topfer3100 Photovoltaic Inverter Testing System Test Items:

Test Items Test Items
1.Leakage current sensor calibration 2.PV/BUS voltage calibration
3.Mains voltage (UW, UO, WO) calibration 4.Inverter voltage calibration
5.PV current calibration / inverter current calibration 6.Efficiency, power factor, harmonic testing
7.DC undervoltage test 8.DC overvoltage test
9.AC over/undervoltage test 10.AC overfrequency
11.AC underfrequency 12.Islanding protection
13.FRT (instantaneous voltage drop) 14.FRT (momentary power failure)
15.FRT (variation of cycle frequency) 16.Supply recovery blocking function
17.Stand-alone operation current calibration 18.Stand-alone operation voltage/frequency test
19.Islanding protection 20.FRT (instantaneous voltage drop)
21.FRT (momentary power failure) 22.FRT (variation of cycle frequency)
23.Supply recovery blocking function 24.Stand-alone operation current calibration
25.Stand-alone operation voltage/frequency test 26.Recovery grid connection protection test
27.Automatic switch on/off test 28.THD measurement
29.Insulation strength 30.Input characteristic test
31.Stability test 32.Special function test (customizable)

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Chuangrui New Energy Co., Ltd
Location Room 5072, Unit 1, Building 1, No. 2, Nancheng Section, Tiyu Road, Nancheng Street, Dongguan City, Guangdong Province
Contact Person Zou Weimin

Request A Quote

Please check your email address.
Your message must be at least 20 characters.