Unit - Spb03kl Air Cooled Condensing Unit for Model 2CES-3Y-40S
Price:
discussed
MOQ:
1piece
Delivery Time:
3-7 days
Brand:
RFJ
Product Description
Unit - SPB03KL Air Cooled Condensing Unit for Model 2CES-3Y-40S
Air Cooled Compressor Condensing Unit - SPB03KL
- Fan Speed Regulator: Adjusts condensing fan according to condensing temperature
- Operation Data Display Function: Monitors important data including compressor current and condensing temperature
- System Alarm Function: Audible alarm activates when system faults occur to alert users
- Independent Operation Board:
- Displays temperature, controls defrosting, checks operation system data, and provides temperature alarms
- Flexible installation options - can be mounted anywhere convenient
Product Images
Technical Specifications - Installation Dimensions
| Condensing Unit Model | Compressor Model | Length L(A) mm | Width W(B) mm | Height H(C) mm |
|---|---|---|---|---|
| SPB03KL | 2CES-3Y | 780 | 680 | 700 |
| SPB04KL | 4EES-4Y | 780 | 680 | 700 |
| SPB05KL | 4DES-5Y | 880 | 760 | 800 |
| SPB06KL | 4CES-6Y | 880 | 760 | 800 |
| SPB09KL | 4TES-9Y | 1130 | 760 | 700 |
| SPB12KL | 4PES-12Y | 1130 | 760 | 700 |
| SPB14KL | 4NES-14Y | 1130 | 760 | 800 |
| SPB18KL | 4HE-18Y | 1340 | 860 | 760 |
| SPB23KL | 4GE-23Y | 1490 | 860 | 960 |
| SPB28KL | 6HE-28Y | 1590 | 860 | 960 |
| SPB34KL | 6GE-34Y | 1590 | 860 | 1360 |
| SPB44KL | 6FE-44Y | 1190 | 360 | 860 |
Frequently Asked Questions
Why we choose such big compressor horsepower?
Fresh food contains significant heat and requires substantial compressor horsepower to cool down within 4-6 hours effectively.
Why the temperature is so low?
Fresh food needs to reach -20°C within 4-6 hours, which requires cold room temperatures of -35°C or -40°C to achieve this rapid cooling.
Why does the blast cold room need to use the vertical air cooler?
Vertical air coolers feature large fin spacing, substantial air flow capacity, and are very easy to install, making them ideal for blast freezing applications.
Can the blast freezer cooling time be shorter?
4-6 hours provides optimal cooling speed while remaining economical. Reducing to 2-3 hours would require even larger horsepower compressors and significantly higher costs.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shenzhen Ruifujie Technology Co., Ltd.
Location
Building 1, Kangli city, No. 66 Pingji Road, Longgang District, Shenzhen Guangdong China
Contact Person
Mike