380V 3pH 50Hz Unit-Spb05kl Air Cooled Condenser for Model 4DES-5Y-40S
Price:
discussed
MOQ:
1piece
Delivery Time:
3-7 days
Brand:
RFJ
Product Description
380V 3pH 50Hz Unit-SPB05KL Air Cooled Condenser for Model 4DES-5Y-40S
Product Description
Unit-SPB05KL Air-Cooled Compressor Condensing for Model 4DES-5Y-40S
Key Features
- Fan speed regulator: Adjusts condensing fan according to condensing temperature
- Operation data display function: Monitors important data including compressor current and condensing temperature
- System alarm function: Audible alarm activates when faults occur to alert users
- Independent Operation Board:
- Displays temperature, controls defrosting, checks operation system data, and provides temperature alarms
- Can be installed in any convenient location
Product Images
Technical Specifications
Technical Data Of Air Cooled Compressor Condensing Unit
| Condensing Unit Model | Compressor Model | Power Supply | Refrigerating Capacity (KW) | Input Power (KW) |
|---|---|---|---|---|
| SPB03KL | 2CES-3Y | 380V/3PH/50HZ | 4.77 | 2.91 |
| SPB04KL | 4EES-4Y | 380V/3PH/50HZ | 6.49 | 4.05 |
| SPB05KL | 4DES-5Y | 380V/3PH/50HZ | 7.55 | 4.79 |
| SPB06KL | 4CES-6Y | 380V/3PH/50HZ | 9.28 | 5.66 |
| SPB09KL | 4TES-9Y | 380V/3PH/50HZ | 11.41 | 6.74 |
| SPB12KL | 4PES-12Y | 380V/3PH/50HZ | 12.64 | 7.34 |
| SPB14KL | 4NES-14Y | 380V/3PH/50HZ | 15.50 | 9.11 |
| SPB18KL | 4HE-18Y | 380V/3PH/50HZ | 21.90 | 12.67 |
| SPB23KL | 4GE-23Y | 380V/3PH/50HZ | 25.80 | 15.06 |
| SPB28KL | 6HE-28Y | 380V/3PH/50HZ | 32.30 | 18.68 |
| SPB34KL | 6GE-34Y | 380V/3PH/50HZ | 38.80 | 22.90 |
| SPB44KL | 6FE-44Y | 380V/3PH/50HZ | 46.20 | 27.50 |
Frequently Asked Questions
Why we choose such big compressor horsepower?
Fresh food has significant heat load and requires substantial compressor horsepower to cool down within 4-6 hours efficiently.
Why does the blast cold room need to use the vertical air cooler?
Vertical air coolers feature large fin spacing, high air flow capacity, and are very easy to install, making them ideal for blast cooling applications.
Can the blast freezer cooling time be shorter?
4-6 hours provides optimal balance between speed and economy. Reducing to 2-3 hours would require significantly larger horsepower compressors and substantially higher costs.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shenzhen Ruifujie Technology Co., Ltd.
Location
Building 1, Kangli city, No. 66 Pingji Road, Longgang District, Shenzhen Guangdong China
Contact Person
Mike