XGC350t Crawler Crane Technical Specifications

 

Crawler crane models: XGC350
Max rated lifting capacity: 350t
Max lifting moment: 2400t.m

 

Typical working conditions

 

Main boom working conditions_Characteristics of main boom hook with boom end pulley auxiliary hook (HBS/1)

Main boom working condition_Working range of main boom main hook with arm end pulley auxiliary hook (HBS/1)

Main boom working condition_Working range of main boom main hook with arm end pulley auxiliary hook (HBS/1)

 

Main boom working condition_with arm end pulley auxiliary hook HBS/1_135t+50t main boom main hook performance (optional)

HBS/1

Main boom length(m)

Radians

24

30

36

42

48

54

60

66

72

78*

84*

90*

96*

(m)

t

t

t

t

t

t

t

t

t

t

t

t

t

6

300.0

 

 

 

 

 

 

 

 

 

 

 

 

7

300.0

300.0

268.0

242.0

 

 

 

 

 

 

 

 

 

8

295.0

292.0

262.0

238.0

209.0

182.0

 

 

 

 

 

 

 

9

263.0

258.0

238.4

223.5

205.8

180.8

168.8

152.0

 

 

 

 

 

10

237.0

226.8

211.6

205.2

186.8

179.2

164.4

148.8

136.8

126.8

 

 

 

11

201.8

197.8

189.4

180.8

171.8

162.2

155.2

148.1

132.7

120.4

108.8

92.8

 

12

176.8

174.8

170.2

161.0

154.1

147.6

141.6

135.9

130.4

121.8

103.8

88.8

78.8

13

156.8

154.3

153.0

146.8

140.8

135.3

130.0

125.0

120.1

115.5

100.4

86.8

75.8

14

143.8

139.1

136.9

134.8

129.6

124.7

119.9

115.5

111.1

107.0

99.9

85.2

73.8

15

126.8

125.3

123.6

123.5

119.8

115.4

111.1

107.2

103.3

99.5

95.9

84.4

73.1

16

115.8

113.8

112.4

112.2

111.2

107.4

103.5

99.8

96.2

92.9

89.5

83.5

72.3

17

105.8

103.8

102.9

102.8

102.3

100.2

96.6

93.3

90.0

87.0

83.8

81.4

71.6

18

97.8

96.0

94.7

94.5

94.1

93.7

90.5

87.5

84.4

81.6

78.7

76.6

70.7

19

91.8

88.9

87.6

87.5

87.0

86.5

85.0

82.2

79.3

76.7

74.0

72.1

69.6

20

84.8

82.7

81.3

81.1

80.7

80.3

79.8

77.5

74.7

72.3

69.7

67.8

65.6

22

74.3

72.3

70.9

70.7

70.2

69.8

69.2

68.8

66.8

64.6

62.3

60.6

58.5

24

 

62.9

62.6

62.4

61.8

61.4

60.7

60.3

59.6

58.1

56.0

54.5

52.6

26

 

56.0

55.6

55.4

54.9

54.4

53.8

53.3

52.7

52.2

50.5

49.2

47.4

28

 

50.1

49.8

49.6

49.1

48.7

48.0

47.5

46.9

46.4

45.7

44.5

42.6

30

 

 

45.3

45.1

44.5

44.1

43.5

42.9

42.3

41.8

41.1

40.3

38.9

32

 

 

40.7

40.6

39.9

39.5

38.9

38.3

37.7

37.2

36.5

36.0

35.1

34

 

 

 

37.3

36.7

36.2

35.6

35.1

34.4

33.9

33.2

32.7

31.9

36

 

 

 

34.1

33.5

33.0

32.4

31.8

31.2

30.7

30.0

29.5

28.7

38

 

 

 

30.8

30.3

29.7

29.1

28.6

27.9

27.4

26.7

26.2

25.5

40

 

 

 

 

27.9

27.3

26.7

26.2

25.5

25.0

24.3

23.8

23.1

42

 

 

 

 

25.4

24.9

24.3

23.7

23.0

22.5

21.8

21.3

20.6

48

 

 

 

 

 

19.3

18.7

18.1

17.4

16.9

16.2

15.7

15.0

50

 

 

 

 

 

 

17.2

16.7

16.0

15.5

14.8

14.3

13.5

52

 

 

 

 

 

 

15.8

15.2

14.5

14.0

13.3

12.8

12.1

54

 

 

 

 

 

 

14.3

13.8

13.1

12.6

11.9

11.4

10.6

58

 

 

 

 

 

 

 

11.5

10.8

10.3

9.5

9.0

8.2

64

 

 

 

 

 

 

 

 

7.8

7.3

6.6

6.1

5.3

68

 

 

 

 

 

 

 

 

 

5.7

4.9

4.3

3.6

74

 

 

 

 

 

 

 

 

 

 

2.7

 

 

Notes:
1. The actual load must be deducted from the values ​​in the table by the weight of the hook, sling and wire rope wrapped around the hook and the boom head.
2. The main boom length "*" mark combination must use a 1.31m waist rope, and the main boom length exceeding 78m must use an inclined wedge to assist the boom.
3. The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the main boom reducer.

 

Main boom working condition_Characteristics of boom end pulley auxiliary hook with main boom main hook (HBS/2)

Main boom working condition_working range of boom end pulley auxiliary hook with main boom main hook (HBS/2)

Main boom working condition_working range of boom end pulley auxiliary hook with main boom main hook (HBS/2)

 

Main boom working condition_with main boom main hook HBS/2_130t+50t arm end pulley auxiliary hook performance

HBS/2

Main boom length (m)

Radians

24

30

36

42

48

54

60

66

72

78*

84*

90*

(m)

t

t

t

t

t

t

t

t

t

t

t

t

7

28.0

 

 

 

 

 

 

 

 

 

 

 

8

28.0

28.0

28.0

 

 

 

 

 

 

 

 

 

9

28.0

28.0

28.0

28.0

28.0

 

 

 

 

 

 

 

10

28.0

28.0

28.0

28.0

28.0

28.0

28.0

 

 

 

 

 

11

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

 

 

 

12

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

 

13

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

14

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

15

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

16

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

17

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

18

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

19

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

20

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

22

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

24

 

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

26

 

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28

 

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

30

 

 

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

32

 

 

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

34

 

 

 

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

36

 

 

 

28.0

28.0

28.0

27.9

27.6

27.2

26.9

26.6

26.4

38

 

 

 

28.0

28.0

28.0

27.7

27.1

26.4

25.8

25.1

24.7

42

 

 

 

 

24.0

23.6

23.0

22.5

21.8

21.2

20.4

19.9

44

 

 

 

 

 

21.8

21.2

20.7

20.0

19.4

18.6

18.1

48

 

 

 

 

 

18.2

17.5

17.0

16.3

15.8

15.1

14.6

50

 

 

 

 

 

 

16.1

15.6

14.9

14.4

13.7

13.2

54

 

 

 

 

 

 

13.3

12.8

12.1

11.6

10.9

10.4

58

 

 

 

 

 

 

 

10.5

9.9

9.4

8.6

8.1

64

 

 

 

 

 

 

 

 

6.9

6.5

5.7

5.2

68

 

 

 

 

 

 

 

 

 

4.9

4.1

3.6

 

Notes:
1. The actual load must be deducted from the values ​​in the table by the weight of the hook, sling and wire rope wrapped around the hook and the boom head.
2. The main boom length "*" mark combination must use a 1.31m waist rope, and the main boom length exceeding 78m must use an inclined wedge to assist the boom.
3. The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the main boom reducer.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shandong Tengfei Hoisting Engineering Co., Ltd.
Location Steel Market in Huantai County, Zibo City, Shandong Province, China
Contact Person Gong

Request A Quote

Please check your email address.
Your message must be at least 20 characters.