Construction Crawler Crane 220tons For Mining Field / Hydraulic Lattice Crawler Crane
The 220T Crawler Crane Has Good Performance In The Mining Field, Which Is Convenient For Construction And Easy To Use.
XLC220 Crawler Crane Technical Specifications
Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m
Typical working conditions
Main boom working condition_with boom end pulley auxiliary hook HBS/1_55t+21t main boom main hook performance
|
Operating radius(m) |
Main boom length(m) |
|||||||||||
|
17 |
20 |
23 |
26 |
29 |
32 |
35 |
38 |
41 |
44 |
47 |
50 |
|
|
5 |
200 |
|
|
|
|
|
|
|
|
|
|
|
|
6 |
196 |
192 |
190.5 |
179 |
|
|
|
|
|
|
|
|
|
7 |
169 |
165 |
159 |
154 |
149 |
144 |
139 |
|
|
|
|
|
|
8 |
138 |
137 |
133 |
129 |
125 |
122 |
118 |
115 |
112 |
103 |
|
|
|
9 |
113 |
113 |
114 |
111 |
108 |
105 |
103 |
100 |
98.2 |
95.8 |
93.5 |
|
|
10 |
95.6 |
96 |
96.3 |
96.5 |
95.4 |
93.2 |
91 |
89 |
86.9 |
85 |
83.1 |
81.2 |
|
12 |
72.1 |
72.5 |
72.8 |
72.9 |
73 |
73 |
73 |
71.8 |
70.3 |
68.9 |
67.5 |
66.2 |
|
14 |
57.2 |
57.7 |
58 |
58.1 |
58.1 |
58.1 |
58.1 |
58 |
58 |
57.6 |
56.5 |
55.5 |
|
16 |
46.9 |
47.4 |
47.7 |
47.8 |
47.9 |
47.9 |
47.9 |
47.8 |
47.7 |
47.6 |
47.5 |
47.3 |
|
18 |
|
39.8 |
40.2 |
40.3 |
40.4 |
40.4 |
40.4 |
40.3 |
40.2 |
40.1 |
39.9 |
39.8 |
|
20 |
|
|
34.4 |
34.6 |
34.7 |
34.7 |
34.6 |
34.5 |
34.5 |
34.3 |
34.2 |
34 |
|
22 |
|
|
|
30 |
30.2 |
30.2 |
30.1 |
30 |
29.9 |
29.8 |
29.7 |
29.5 |
|
24 |
|
|
|
26.3 |
26.5 |
26.5 |
26.5 |
26.4 |
26.3 |
26.1 |
26 |
25.8 |
|
26 |
|
|
|
|
23.4 |
23.4 |
23.4 |
23.3 |
23.3 |
23.1 |
23 |
22.8 |
|
28 |
|
|
|
|
|
20.9 |
20.9 |
20.8 |
20.7 |
20.6 |
20.4 |
20.3 |
|
30 |
|
|
|
|
|
|
18.7 |
18.6 |
18.5 |
18.4 |
18.3 |
18.1 |
|
32 |
|
|
|
|
|
|
16.8 |
16.7 |
16.7 |
16.5 |
16.4 |
16.2 |
|
34 |
|
|
|
|
|
|
|
15.1 |
15 |
14.9 |
14.8 |
14.6 |
|
36 |
|
|
|
|
|
|
|
|
13.6 |
13.5 |
13.3 |
13.2 |
|
38 |
|
|
|
|
|
|
|
|
|
12.2 |
12 |
11.9 |
|
40 |
|
|
|
|
|
|
|
|
|
11 |
10.9 |
10.7 |
|
42 |
|
|
|
|
|
|
|
|
|
|
9.9 |
9.7 |
|
44 |
|
|
|
|
|
|
|
|
|
|
|
8.8 |
|
Magnification |
18 |
18 |
16 |
14 |
13 |
12 |
11 |
10 |
9 |
9 |
8 |
8 |
Notes:
1.When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
Main boom working condition_with boom end pulley auxiliary hook HBS/1_55t+21t main boom main hook performance
|
Operating radius(m) |
Main boom length(m) |
|||||||
|
53 |
56 |
59 |
62 |
65 |
68 |
71* |
74* |
|
|
10 |
79.7 |
78 |
76.3 |
68.5 |
|
|
|
|
|
12 |
65.2 |
63.9 |
62.7 |
61.4 |
60.2 |
59.1 |
57.8 |
|
|
14 |
54.7 |
53.7 |
52.7 |
51.7 |
50.7 |
49.9 |
48.9 |
47.2 |
|
16 |
46.9 |
46 |
45.2 |
44.4 |
43.5 |
42.9 |
42 |
40.6 |
|
18 |
39.9 |
39.8 |
39.3 |
38.6 |
37.9 |
37.3 |
36.5 |
35.3 |
|
20 |
34.2 |
34 |
33.9 |
33.7 |
33.3 |
32.8 |
32.1 |
31.0 |
|
22 |
29.7 |
29.5 |
29.3 |
29.1 |
28.9 |
28.8 |
28.4 |
27.5 |
|
24 |
26 |
25.8 |
25.6 |
25.4 |
25.2 |
25.2 |
24.9 |
24.5 |
|
26 |
23 |
22.8 |
22.6 |
22.4 |
22.2 |
22.1 |
21.9 |
21.6 |
|
28 |
20.4 |
20.2 |
20.1 |
19.9 |
19.6 |
19.6 |
19.3 |
19.0 |
|
30 |
18.2 |
18.1 |
17.9 |
17.7 |
17.5 |
17.4 |
17.1 |
16.9 |
|
32 |
16.4 |
16.2 |
16 |
15.8 |
15.6 |
15.5 |
15.2 |
15.0 |
|
34 |
14.7 |
14.6 |
14.4 |
14.2 |
14 |
13.9 |
13.6 |
13.3 |
|
36 |
13.3 |
13.1 |
13 |
12.8 |
12.5 |
12.4 |
12.2 |
11.9 |
|
38 |
12 |
11.9 |
11.7 |
11.5 |
11.3 |
11.2 |
10.9 |
10.6 |
|
40 |
10.9 |
10.7 |
10.5 |
10.3 |
10.1 |
10 |
9.8 |
9.5 |
|
42 |
9.9 |
9.7 |
9.5 |
9.3 |
9.1 |
9 |
8.7 |
8.5 |
|
44 |
8.9 |
8.8 |
8.6 |
8.4 |
8.2 |
8.1 |
7.8 |
7.6 |
|
46 |
8.1 |
7.9 |
7.8 |
7.6 |
7.3 |
7.2 |
7 |
6.7 |
|
48 |
|
7.2 |
7 |
6.8 |
6.6 |
6.5 |
6.2 |
6.0 |
|
50 |
|
6.4 |
6.3 |
6.1 |
5.9 |
5.8 |
5.5 |
5.3 |
|
52 |
|
|
5.6 |
5.4 |
5.2 |
5.1 |
4.9 |
4.6 |
|
54 |
|
|
|
4.8 |
4.6 |
4.5 |
4.3 |
4.0 |
|
56 |
|
|
|
|
4.1 |
4 |
3.7 |
3.5 |
|
58 |
|
|
|
|
3.5 |
3.5 |
3.2 |
3.0 |
|
60 |
|
|
|
|
|
3 |
2.7 |
2.5 |
|
62 |
|
|
|
|
|
|
2.3 |
2.0 |
|
Magnification |
7 |
6 |
6 |
6 |
5 |
5 |
5 |
4 |
Notes:
1.When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.