Shandong Tengfei Hoisting Engineering Co., Ltd.
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Used 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work Efficiency

Price Negotiable
Price: Negotiable Price
MOQ: One Crane
Delivery Time: According to Order Confirmation
Brand: XCMG
Product Description

Used 350T Crawler Crane Lifting Equipment To Improve Work Efficiency


XGC350t Crawler Crane Technical Specifications 


Crawler crane models: XGC350
Max rated lifting capacity: 350t
Max lifting moment: 2400t.m


Typical working conditions


Light main boom working condition


Lightweight boom working condition_ Characteristics of lightweight boom hook without boom end pulley (LB/1)

Lightweight boom working condition_Working range of lightweight boom main hook without boom end pulley (LB/1)

Lightweight main boom working condition_working range diagram of main hook of lightweight main boom without arm end pulley (LB/1)


Lightweight boom working condition_no boom end pulley LB/1_130t+50t lightweight boom main hook performance

LB/1

Lightweight main boom length (m)

Radians

73.5*

79.5*

85.5*

91.5*

97.5*

103.5**

109.5**

115.5**

(m)

t

t

t

t

t

t

t

t

9

100.0








10

98.5

96.8

90.0






11

95.0

93.3

89.0

73.6

65.7




12

92.6

91.8

88.4

72.2

65.1

56.4

47.9


13

90.1

89.6

87.0

70.9

64.5

55.9

47.5

40.6

14

88.2

88.1

86.1

69.7

63.8

55.4

47.1

40.2

16

84.4

85.0

83.9

67.2

62.5

54.2

46.2

39.4

18

80.2

82.0

81.7

65.0

61.3

52.4

45.2

38.6

20

76.5

77.9

75.5

62.7

59.9

50.6

44.3

37.8

22

72.7

70.4

68.2

60.7

58.7

49.0

43.1

36.9

24

65.5

64.1

62.0

58.7

57.5

47.4

41.7

36.1

26

58.6

58.1

56.7

55.2

53.5

45.9

40.5

35.3

28

52.9

52.4

51.6

50.7

49.2

44.4

39.3

34.3

30

48.0

47.5

46.8

46.4

45.3

44.0

38.1

33.3

32

43.9

43.3

42.5

42.2

41.7

40.9

37.1

32.3

34

40.3

39.6

38.9

38.6

38.0

37.8

36.0

31.5

36

36.7

36.5

35.8

35.4

34.9

34.6

34.2

30.5

38

33.9

33.3

32.9

32.6

32.0

31.7

31.3

29.7

40

31.5

30.9

30.1

30.0

29.5

29.2

28.8

28.5

42

29.3

28.7

27.9

27.6

27.2

26.9

26.5

26.2

44

27.3

26.7

25.9

25.5

25.0

24.9

24.4

24.2

48

23.4

23.2

22.4

22.0

21.5

21.2

20.9

20.6

52

20.6

20.0

19.6

19.2

18.6

18.2

17.8

17.7

56

18.2

17.6

16.9

16.7

16.1

15.8

15.4

15.1

60

16.1

15.5

14.7

14.3

14.0

13.7

13.2

12.9

64

14.2

13.6

12.9

12.5

12.0

11.9

11.4

11.1

70


11.3

10.6

10.2

9.7

9.4

9.0

8.7

74



9.3

8.9

8.4

8.1

7.6

7.4

76



8.7

8.3

7.8

7.5

7.0

6.8

80




7.2

6.6

6.4

5.9

5.6

86





5.2

4.7

4.3

4.0

92







3.1

2.8

94







2.7


Notes:
1. The actual load must be deducted from the values ​​in the table by the weight of the hook, sling and wire rope wrapped around the hook and the boom head.
2. The "*" light main boom combination requires a 1.27m waist rope. The "**" light main boom combination requires 1.27m and 2.61m waist ropes.
3. The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be installed at the main boom reducer.


Lightweight boom working condition_no boom end pulley LB/1_135t+50t lightweight boom main hook performance (optional)

LB/1

Lightweight main boom length (m)

Radians

73.5*

79.5*

85.5*

91.5*

97.5*

103.5**

109.5**

115.5**

(m)

t

t

t

t

t

t

t

t

9

100.0








10

99.0

97.5

92.0






11

96.0

94.3

90.1

75.0

68.0




12

94.0

92.6

89.2

73.4

66.1

58.0

49.0


13

92.0

91.0

88.3

72.0

65.4

56.8

48.3

42.0

14

88.6

89.4

87.5

70.7

64.8

56.2

47.8

40.8

16

84.8

85.4

84.3

68.2

63.5

55.0

46.9

40.0

18

80.6

82.4

82.1

65.3

61.6

52.6

45.4

38.8

20

76.9

79.5

78.0

63.0

60.2

50.9

44.5

38.0

22

73.4

72.9

70.5

60.9

59.0

49.2

43.3

37.1

24

67.7

66.4

64.2

59.0

57.8

47.6

41.9

36.3

26

60.6

60.1

58.8

57.1

55.5

46.1

40.7

35.5

28

54.8

54.2

53.5

52.6

51.1

44.6

39.5

34.4

30

49.8

49.2

48.5

48.0

47.1

44.2

38.3

33.5

32

45.4

44.9

44.2

43.8

43.3

42.0

37.2

32.4

34

41.7

41.2

40.5

40.0

39.5

39.2

36.2

31.6

36

37.9

37.9

37.1

36.7

36.2

35.9

35.2

30.7

38

35.1

34.4

34.2

33.8

33.3

33.0

32.6

29.8

40

32.6

32.0

31.2

31.3

30.7

30.4

30.0

29.1

42

30.2

29.6

28.9

28.5

28.4

28.1

27.7

27.4

44

28.2

27.6

26.9

26.4

25.9

26.0

25.6

25.3

48

24.3

24.1

23.3

23.0

22.3

22.0

21.9

21.6

52

21.4

20.8

20.3

20.0

19.4

19.1

18.7

18.6

56

18.9

18.3

17.6

17.4

16.8

16.5

16.1

15.8

60

16.8

16.2

15.5

15.0

14.7

14.4

13.9

13.6

64

14.9

14.3

13.5

13.1

12.6

12.5

12.1

11.8

70


11.9

11.2

10.8

10.2

10.0

9.6

9.3

74



9.8

9.4

8.9

8.6

8.2

8.0

76




8.5

8.0

7.7

7.3

7.1

80




7.7

7.1

6.8

6.4

6.1

86





5.6

5.3

4.8

4.5

92







3.5

3.2

94







3.1

2.8

Notes:
1. The actual load must be deducted from the values ​​in the table by the weight of the hook, sling and wire rope wrapped around the hook and the boom head.
2. The "*" light main boom combination requires a 1.27m waist rope. The "**" light main boom combination requires 1.27m and 2.61m waist ropes.
3. The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be installed at the main boom reducer.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shandong Tengfei Hoisting Engineering Co., Ltd.
Location Steel Market in Huantai County, Zibo City, Shandong Province, China
Contact Person Gong

Request A Quote

Please check your email address.
Your message must be at least 20 characters.