Shandong Tengfei Hoisting Engineering Co., Ltd.
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System

Price Negotiable
Price: Negotiable Price
MOQ: One Crane
Delivery Time: According to Order Confirmation
Brand: XCMG
Product Description

260T Crawler Crane Plays A Key Role In Power Engineering Installation

XLC260 Crawler Crane Technical Specifications

 

Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m

 

Main boom working condition_Characteristics of boom end pulley auxiliary hook with main boom main hook (HBS/2)

 

Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

 

23

26

29

32

35

38

41

44

47

50

53

7

13.5

13.5

 

 

 

 

 

 

 

 

 

8

13.5

13.5

13.5

13.5

13.5

 

 

 

 

 

 

9

13.5

13.5

13.5

13.5

13.5

13.5

13.5

 

 

 

 

10

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

11

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

12

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

 

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

38

 

 

 

 

 

 

13.5

13.5

13.5

13.5

13.5

40

 

 

 

 

 

 

 

13.5

13.2

13.1

12.9

42

 

 

 

 

 

 

 

 

12

11.8

11.6

44

 

 

 

 

 

 

 

 

10.8

10.6

10.4

46

 

 

 

 

 

 

 

 

8

9.6

9.4

48

 

 

 

 

 

 

 

 

 

 

8.4

Magnification

1

1

1

1

1

1

1

1

1

1

1

 

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

 

Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

 

56

59

62

65

68

71

74

77*

80*

11

13.5

13.5

 

 

 

 

 

 

 

12

13.5

13.5

13.5

13.5

13.5

 

 

 

 

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

 

 

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

38

13.5

13.5

13.5

13.5

13.5

13.5

13.2

13.1

12.9

40

13

12.8

12.6

12.4

12.1

12

11.7

11.7

11.4

42

11.8

11.5

11.3

11.1

10.8

10.7

10.4

10.4

10.1

44

10.6

10.4

10.2

9.9

9.7

9.5

9.3

9.2

9

46

9.6

9.3

9.1

8.9

8.6

8.5

8.2

8.2

7.9

48

8.6

8.4

8.2

7.9

7.7

7.5

7.3

7.2

7

50

7.7

7.5

7.3

7

6.8

6.7

6.4

6.4

6.1

52

6.9

6.7

6.5

6.2

6

5.8

5.6

5.5

5.3

54

 

5.9

5.7

5.5

5.2

5.1

4.8

4.8

4.5

56

 

 

5

4.8

4.5

4.4

4.2

4.1

3.9

58

 

 

 

4.1

3.9

3.8

3.5

3.5

3.2

60

 

 

 

3.5

3.3

3.2

2.9

2.9

2.6

62

 

 

 

 

2.7

2.6

2.3

2.3

2.1

64

 

 

 

 

 

2.1

1.8

1.8

 

Magnification

1

1

1

1

1

1

1

1

1

 

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shandong Tengfei Hoisting Engineering Co., Ltd.
Location Steel Market in Huantai County, Zibo City, Shandong Province, China
Contact Person Gong

Request A Quote

Please check your email address.
Your message must be at least 20 characters.