260T Crawler Mobile Cranes Lifting Of Petroleum And Chemical Equipment
260T Crawler Crane Can Be Used In Practical Application In The Lifting Of Petroleum And Chemical Equipment
XLC260 Crawler Crane Technical Specifications
Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m
Tower jib working condition
Main boom section combination for tower type jib working condition
|
Name and quantity
Main boom length |
Main boom bottom section 9m |
Intermediate section 3mA |
Intermediate section 6mA |
Intermediate section 12mA |
Transition section 6m |
Intermediate section 3mB |
Intermediate section 6mB |
Intermediate section 12mB |
Main boom top section 5m |
|
HB23 |
1 |
1 |
0 |
0 |
1 |
0 |
0 |
0 |
1 |
|
HB26 |
1 |
0 |
1 |
0 |
1 |
0 |
0 |
0 |
1 |
|
HB29 |
1 |
1 |
1 |
0 |
1 |
0 |
0 |
0 |
1 |
|
HB32 |
1 |
0 |
0 |
1 |
1 |
0 |
0 |
0 |
1 |
|
HB35 |
1 |
1 |
0 |
1 |
1 |
0 |
0 |
0 |
1 |
|
HB38 |
1 |
0 |
1 |
1 |
1 |
0 |
0 |
0 |
1 |
|
HB41 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
1 |
|
HB44 |
1 |
0 |
0 |
2 |
1 |
0 |
0 |
0 |
1 |
|
HB47 |
1 |
1 |
0 |
2 |
1 |
0 |
0 |
0 |
1 |
|
HB50 |
1 |
0 |
1 |
2 |
1 |
0 |
0 |
0 |
1 |
|
HB53 |
1 |
1 |
1 |
2 |
1 |
0 |
0 |
0 |
1 |
|
HB56 |
1 |
0 |
0 |
2 |
1 |
0 |
0 |
1 |
1 |
Jib section combination for tower jib working condition
|
Name and quantity
Jib length |
Tower boom bottom section 1.5m |
Intermediate section 3mB |
Intermediate section 6mB |
Intermediate section 12mB |
Tower boom transition section 4.5m |
Intermediate section 3mC |
Intermediate section 6mC |
Intermediate section 12mC |
Tower boom top section 3m |
|
W18 |
1 |
1 |
1 |
0 |
1 |
0 |
0 |
0 |
1 |
|
W21 |
1 |
1 |
1 |
0 |
1 |
1 |
0 |
0 |
1 |
|
W24 |
1 |
1 |
1 |
0 |
1 |
0 |
1 |
0 |
1 |
|
W27 |
1 |
1 |
0 |
1 |
1 |
1 |
0 |
0 |
1 |
|
W30 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
1 |
|
W33 |
1 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
1 |
|
W36 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
0 |
1 |
|
W39 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
|
W42 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
1 |
1 |
|
W45 |
1 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
1 |
|
W48 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
1 |
1 |
|
*W51 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
|
*W54 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
2 |
1 |
|
*W57 |
1 |
1 |
1 |
1 |
1 |
1 |
0 |
2 |
1 |
|
*W60 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
2 |
1 |
|
*W63 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
2 |
1 |
Note:1. “*” tower arm length requires the use of waist rope.
2.Each boom section needs to be installed with a tower arm back plate, and the top section of the main boom needs to be installed with a tower arm guide pulley.
3.When the combined length of the main boom + tower arm exceeds 71m, it is recommended to use an inclined wedge to assist the arm raising.
Tower jib working condition (HW) jib raising table (counterweight combination 85t+30t)
|
Main boom
Tower Jib |
HB23 |
HB26 |
HB29 |
HB32 |
HB35 |
HB38 |
HB41 |
HB44 |
HB47 |
HB50 |
HB53 |
HB56 |
|
W18 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W21 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W24 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W27 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W30 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W33 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W36 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W39 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W42 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
|
W45 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
|
W48 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
|
*W51 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
|
*W54 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
|
*W57 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
|
*W60 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
|
*W63 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
× |
Note:1.When raising the boom, please place the track drive wheel behind the vehicle body.
2."●" - the boom can be raised, "×" - the boom cannot be raised, and the working condition cannot be used. 3. "*" - the tower jib length requires a waist rope.
4.For the combination of the main boom and the tower jib with a total length of more than 71m, if conditions permit, it is recommended to use a wedge to assist the boom raising to ensure safer raising and lowering of the boom.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.