Shandong Tengfei Hoisting Engineering Co., Ltd.
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Heavy Tasks Xcmg Crawler Crane 300 Tons Lifting Capacity

Price Negotiable
Price: Negotiable Price
MOQ: One Crane
Delivery Time: According to Order Confirmation
Brand: XCMG
Product Description

 

XGC 300t (-I) Crawler Crane With Lightweight Main Boom Main Hook Without Arm End Pulley Auxiliary Hook.

XGC 300t(-I)Crawler Crane Technical Specifications


Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m

 

Lightweight boom working condition_ Characteristics of lightweight boom hook without boom end pulley (LB/1)

Lightweight main boom working condition_Working range diagram of lightweight main boom main hook without arm end pulley (LB/1)

 

 

Lightweight main boom working condition_Working range diagram of lightweight main boom main hook without arm end pulley auxiliary hook (LB/1)

Lightweight boom working condition_no boom end pulley LB/1_115t+40t lightweight boom main hook performance

 

LB/1

Lightweight main boom length(m)

Radians

65.5

68.5

71.5

74.5 *

77.5 *

80.5 *

83.5 **

86.5 **

89.5 **

92.5 **

95.5 **

98.5 **

101.5 **

104.5 **

(m)

t

t

t

t

t

t

t

t

t

t

t

t

t

 

9

91.0

 

 

 

 

 

 

 

 

 

 

 

 

 

10

90.0

87.0

82.3

75.2

 

 

 

 

 

 

 

 

 

 

11

89.0

86.0

80.7

73.4

72.1

71.3

69.6

57.6

 

 

 

 

 

 

12

88.0

85.0

79.1

71.8

70.7

70.2

68.8

56.4

54.1

50.0

48.0

41.0

 

 

13

84.7

82.8

77.7

70.0

69.4

68.9

68.2

55.2

53.1

49.6

47.2

39.8

39.1

38.0

14

82.3

80.5

76.3

67.9

67.0

66.7

65.5

53.9

53.0

49.0

46.7

39.0

37.9

36.8

16

74.8

73.1

69.7

64.2

63.0

64.0

63.5

51.6

50.9

48.0

46.2

37.3

36.8

35.7

18

68.3

66.7

63.5

60.8

60.4

62.5

62.0

49.4

48.9

47.8

45.8

36.3

35.7

34.2

20

62.1

60.7

58.1

56.7

57.6

57.1

55.8

47.0

46.4

46.2

44.8

34.9

34.7

33.4

22

56.1

54.9

53.0

52.4

53.3

55.2

51.2

44.8

44.2

44.5

44.0

33.6

33.8

32.6

24

50.8

49.7

47.6

48.9

51.0

52.2

45.8

42.7

42.3

43.0

42.9

32.4

32.7

31.8

26

45.9

44.9

43.3

46.7

48.0

47.5

43.3

40.9

40.6

41.3

41.5

31.3

31.6

31.0

28

41.5

40.6

39.4

43.8

43.6

43.4

39.1

38.8

38.5

40.0

40.4

30.3

30.6

30.3

30

37.7

36.9

35.9

39.8

39.5

39.3

35.4

35.5

37.0

37.9

37.4

29.3

29.7

29.5

32

34.4

33.6

32.9

36.3

36.1

35.8

32.5

34.1

35.2

34.9

34.4

28.4

28.9

28.8

34

31.7

30.9

30.2

33.3

33.0

32.8

31.3

32.5

32.2

31.9

31.7

27.6

27.8

27.8

36

29.3

28.5

27.6

30.7

30.4

30.2

30.1

29.8

29.6

29.3

29.0

26.4

27.0

27.2

38

27.0

26.3

25.4

28.3

28.0

27.8

27.7

27.5

27.2

26.9

26.6

25.7

26.3

26.5

40

24.9

24.4

23.3

26.2

25.9

25.7

25.6

25.4

25.1

24.8

24.5

24.9

24.7

24.4

42

23.1

22.3

21.4

24.4

24.1

23.8

23.7

23.5

23.2

23.0

22.7

23.1

22.8

22.5

44

21.3

20.5

19.8

22.7

22.4

22.2

22.1

21.8

21.5

21.3

21.0

21.4

21.1

20.8

46

19.7

18.9

18.4

21.1

20.8

20.6

20.5

20.3

20.0

19.7

19.4

19.8

19.5

19.3

50

18.0

17.8

16.1

18.5

18.2

17.9

17.8

17.6

17.3

17.0

16.7

17.1

16.9

16.6

52

16.5

16.0

14.8

17.3

17.0

16.8

16.7

16.4

16.1

15.9

15.6

16.0

15.7

15.4

58

12.3

11.6

10.5

14.3

14.0

13.8

13.7

13.4

13.1

12.9

12.5

13.0

12.7

12.4

60

 

10.6

9.5

13.4

13.1

12.9

12.8

12.6

12.3

12.0

11.7

12.1

11.8

11.5

64

 

 

 

11.8

11.6

11.3

11.2

11.0

10.7

10.4

10.1

10.5

10.2

10.0

68

 

 

 

 

10.2

10.0

9.9

9.6

9.3

9.1

8.8

9.2

8.9

8.6

72

 

 

 

 

 

 

8.6

8.4

8.1

7.8

7.5

8.0

7.7

7.4

76

 

 

 

 

 

 

 

7.3

7.0

6.8

6.5

6.9

6.6

6.3

80

 

 

 

 

 

 

 

 

 

5.8

5.5

5.9

5.6

5.3

84

 

 

 

 

 

 

 

 

 

 

4.6

5.0

4.7

4.5

88

 

 

 

 

 

 

 

 

 

 

 

 

3.9

3.7

 

Notes:

1. "*" Light main boom combination requires the use of 1.25m waist rope. "**" Light main boom combination requires the use of 1.25m and 2.62m waist rope.

2. The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be installed at the main boom reducer.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shandong Tengfei Hoisting Engineering Co., Ltd.
Location Steel Market in Huantai County, Zibo City, Shandong Province, China
Contact Person Gong

Request A Quote

Please check your email address.
Your message must be at least 20 characters.