Cutter Blades Suction Dredger With Diesel Engine Or Electric Motor Pump Power
| Attribute | Value |
|---|---|
| Name | 18inch Cutter blades suction dredger |
| Hydraulic Control System | Rexroth |
| Cutter Blade Quantity | 5-6 Pieces |
| Pump Power | Diesel Engine Or Electric Motor |
| Power | Up To 900kw |
| Width | 2.0-8.8 Meter |
| Steel Plate Type | Marine Steel |
| Hull Depth | 1.6 M |
The Cutter Suction Dredger is a versatile vessel designed for efficient dredging operations in various water bodies. Equipped with advanced technology, it effectively removes sediment and debris from seabeds with high efficiency and reliability.
Key features include 5-6 durable cutter blades for cutting through compacted soil and rocks, a modular hull design for easy transport and assembly, and flexible power options (diesel or electric) to suit different operational requirements.
| JMD450 Diesel engine cutter blades suction dredger | |
| Dredging Pump | Dia. Discharge pipe 450mm |
| Head | 55m |
| Max. Working capacity | 400m3/h |
| Discharge distance | 1500m |
| Dredging depth | 12m |
| Diesel Engine | 746KW | Cummins |
| Emergency Generator | 16KW | WEICHAI |
| Total power | 762KW |
| Oil Consumption | 115L/H |
| Hull Dimension | LOA*W*D 37m×6.9m×1.8m |
The JMD450 cutter suction dredger is suitable for various environments including rivers, lakes, and ports. It handles soil types II-IV (fine sand, clay, silt, coarse sand) in inland and coastal areas.
- Channel deepening in ports and harbors
- River maintenance and flood control
- Mineral extraction in mining operations
- Coastal area dredging projects
Our dredgers can be customized to meet specific project requirements:
- Anchor booms or spud carriage installation
- 5-anchor system for improved balance
- Hydraulic spud flat down system
- Additional underwater dredging pump (20-30m depth)
- Booster station for extended discharge distance
We provide comprehensive technical support including:
- Operator training programs
- Maintenance plans and spare parts supply
- On-site installation and commissioning
- Troubleshooting assistance
- Packaging: Secured in wooden crates
- Shipping Method: Sea freight
- Estimated Delivery Time: 4-6 weeks
Jin Meng
JMD450
China
500m3/h
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.