Powerful Cutter Suction Dredger Up To 1000mm Discharge Diameter 200kW Cutter Power
| Attribute | Value |
|---|---|
| Output Distance | 2500m |
| Optional Equipment | Water Flow Meter, Sounder Depth Meter |
| Hull Type | Cutter Suction |
| Cutter Teeth Quantity | 40-60 Pieces |
| Cutter Power | Up To 200kW |
| Cutter Blade Quantity | 5-6 Pieces |
| Discharge Diameter | Up To 1000mm |
| Pump Size | 450WN |
The cutter suction dredger is available in self-propelled or non-self-propelled configurations with a portable design. The hull features a dismantle and box-like structure, allowing for easy assembly at the worksite and convenient transportation by road, railway, or container. The power system can be customized as either electric or diesel engine driven to meet specific project requirements.
- Product Name: Cutter Suction Dredger
- Generator Set: Cummins Engine, Stanford Generator
- Cutter Blade Quantity: 5-6 Pieces
- Front Plate Thickness: 5mm-20mm
- Cutter Teeth Quantity: 40-60 Pieces
- Power Type: Diesel/Electric
| Model | JMD550 22inch Cutter Suction Dredger |
| Dredging Pump | Dia. Discharge pipe 550mm |
| Head | 65m |
| Max. Working Capacity | 900m³/h |
| Discharge Distance | 3000m |
| Dredging Depth | 14m |
| Diesel Engine | 1306KW Cummins |
| Hydraulic Auxiliary Engine | 336KW Cummins |
| Emergency Generator | 20KW WEICHAI |
| Total Power | 1662KW |
| Oil Consumption | 250L/H |
| Hull Dimensions | LOA×W×D: 42m×7.5m×2.0m |
The JMD550 Cutter Suction Dredger is a versatile solution for various dredging projects:
- River and canal dredging for waterway maintenance and flood prevention
- Port and harbor maintenance to ensure safe navigation
- Land reclamation projects for creating new land areas
- Coastal protection and beach nourishment
- Underwater mining operations for mineral extraction
The dredger can be custom-configured to meet specific project requirements:
- Anchor booms installation
- Spud carriage configuration
- 5-anchor positioning system
- Hydraulic driving for spud flat down
- Additional underwater dredging pump for depths of 20-30m
- Booster station for extended discharge distance
The dredger components are securely packed in wooden crates with protective wrapping. Shipping is typically via sea freight with an estimated delivery time of 4-6 weeks.
For more information about the JMD550 22inch cutter power suction dredger or to schedule a visit to our facilities, please contact our sales team.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.