Refrigerator Cabinet Bottom Progressive Die Tooling ±0.003mm Tolerance Custom Stamping Dies
DC51D Metal Stamping Die Stage Die For Refrigerator Cabinet Bottom ±0.003mm Tolerance
Description:
Our Premium Stage Die delivers reliable and precise stamping for refrigerator cabinet bottoms. Engineered for consistency and durability, it ensures every panel meets the highest quality standards. The die enhances production efficiency by streamlining the stamping process while minimizing material waste. With robust construction and smooth operation, it provides repeatable accuracy and superior performance for modern manufacturing environments. Perfect for high-volume production, this stage die combines speed, reliability, and precision to elevate your output quality.
Quick Detail:
- Cycle period: 6–14s according to product type.
- Fast repair achievable in 30 minutes, tool change in 15 minutes.
- Punch edges sharpen after 300,000–500,000 strokes.
- Each die’s movement is software-regulated.
- One press table and tool set is enough to produce cabinets, cutting costs.
- Sub-dies can be removed individually for maintenance.
- One tool set supports multiple models; program enables tool changeover.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

