1T 950mm Hot Stamping Molds Stage Mold For Refrigerator Compressor
Metal Stamping Mold Stage Mold For Refrigerator Compressor Traverse White Household Appliance
Description:
Our Metal Stamping Mold Stage Mold for Refrigerator Compressor Traverse White Household Appliance is designed for precise forming of refrigerator compressor traverse components. Built for durability and consistent performance, this mold ensures accurate dimensions, smooth production cycles, and long service life. Suitable for various sheet metal materials used in white household appliances, it helps manufacturers improve production efficiency, maintain product quality, and support reliable large-scale manufacturing operations.
Quick Detail:
- Adjustable cycle time 6–14 seconds by product.
- Quick 30-minute repair; 15-minute tool replacement.
- Punch edge sharpen after 300–500k strokes.
- Software manages die motions.
- Cabinet making requires only one press table & tools, saving equipment.
- Only sub-die removal for maintenance.
- Multi-model production with one tool set via program.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

