Sichuan Panda Paint International Trade Co., Ltd.
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

Customizable Metallic Epoxy Flooring 86Mpa Fireproof Metallic Concrete Epoxy

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 7-15 Working Days
Brand: Panda Paint
Product Description

Metallic Epoxy Flooring

 

Scope of Application
1.Suitable for floors requiring wear resistance, chemical corrosion resistance, pressure resistance, as well as aesthetic and environmental performance.
2.Suitable for floors in offices, exhibition halls, and walkways of public buildings, commercial floors, and landmark projects.
3.Suitable for indoor floors in hospitals, exhibition halls, shopping malls, schools, underground parking garages, supermarkets, large retail stores, etc.


Coating Properties
·Seamless and easy to clean
·Durable, mold-resistant and corrosion-resistant
·Customizable design, low maintenance cost
·Pressure and impact resistant


Coating Structure:

 

Technical Indicators
All tests (except drying time) need to be performed after 7 days of curing at 25°C.

 

Experimental Items Unit Indicator
Fire resistance (GB/T 5544) A1F1
 Compressive strength Mpa 86
Flexural strength Mpa 22.1
Tensile strength Mpa >13 Mpa (mixed material, 7d/+23°C)
Tensile bond strength (dry) Mpa 3.32 Mpa (base material internal failure)
Tensile bond strength (wet) Mpa 2.18 Mpa (base material internal failure)
Shore hardness D 95
Impact resistance (Grade II) 1000g steel ball, dropped from a height of 100cm, with no cracks or peeling on the coating
Abrasion resistance 750g/500r 0.017g
High temperature resistance Withstands continuous high temperature up to 60°C
Slip resistance Dry friction coefficient 0.68
Water absorption (SN/T 0308-93) No significant change

 

Construction Procedures
Coating thickness: Generally 1mm-3mm; re-sanding is required if exceeding 2mm.
The floor can be walked on after 24 hours and subjected to heavy loads after 72 hours of construction. (Based on 25°C; the opening time should be extended moderately at low temperatures.)

 

Crack-resistant leveling layer---- Apply base coat----Lay fiberglass mesh----Apply flexible membrane----Fix dividing strips----Material mixing----Paving operation----Grouting----Rough grinding----Repair----Fine grinding----Repair----Top coating

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Sichuan Panda Paint International Trade Co., Ltd.
Location Building 8, Section B, China Railway Industrial Park, Jinniu District, Chengdu City, Sichuan Province, China
Contact Person Lynn

Request A Quote

Please check your email address.
Your message must be at least 20 characters.