A10VSO140DRF/32L-PPB22U00 A10VSO140DRF/32L-PPB22U99 A10VSO140DRF1/32L-PPB22U99 Rexroth Mechanical Engineering Equipment Variable Piston Pump Imported from Germany
Price:
negotiation
MOQ:
negotiation
Delivery Time:
negotiation
Brand:
Rexroth
Product Description
A10VSO140DRF/32L-PPB22U00 A10VSO140DRF/32L-PPB22U99 A10VSO140DRF1/32L-PPB22U99 Rexroth Mechanical Engineering Equipment Variable Piston Pump Imported from Germany
| Parameter | Details |
|---|---|
| Brand Name | Rexroth |
| Place of Origin | Fujian, China |
| Warranty | 12 Months |
| Video Outgoing-Inspection | Provided |
| Machinery Test Report | Provided |
| Application | Machinery Repair Shops |
| Material | Iron |
| Condition | Original |
| Quality Assurance | 100% Tested, Great Performance |
| Certification | ISO |
| Key Features | Long Service Life, Low Noise |
A10VSO45DG/32L-VPB22U00
A10VSO45DRG/32L-PPB22U00
A10VSO45DRF1/32L-PPB22U00
A10VSO45DRS/32L-PPB22U00
A10VSO45DRF/32L-PPB22U00
A10VSO45DR/32L-PPB22U00
A10VSO180DG/32R-PPB32U00
A10VSO71DRS/32L-PPB22U99
A10VSO71DRF/32L-VPB22U99
A10VSO180DR/32R-VPB22U00
A10VSO180DRS/32R-PPB22U00
A10VSO140DG/32R-PPB32U0
A10VSO180DG/32R-VPB22U00
A10VSO140DG/32R-PPB32U99
A10VSO140DG/32R-VPB32U00
A10VSO140DG/32R-VPB32U99
A10VSO180DR/32R-PPB22U00
A10VSO140DRF/32R-VPB22U00
A10VSO180DRG/32R-PPB22U00
A10VSO140DRF/32R-VPB22U99
A10VSO180DG/32R-PPB22U00
A10VSO180DRF/32R-PPB22U00
A10VSO45DRG/32L-PPB22U00
A10VSO45DRF1/32L-PPB22U00
A10VSO45DRS/32L-PPB22U00
A10VSO45DRF/32L-PPB22U00
A10VSO45DR/32L-PPB22U00
A10VSO180DG/32R-PPB32U00
A10VSO71DRS/32L-PPB22U99
A10VSO71DRF/32L-VPB22U99
A10VSO180DR/32R-VPB22U00
A10VSO180DRS/32R-PPB22U00
A10VSO140DG/32R-PPB32U0
A10VSO180DG/32R-VPB22U00
A10VSO140DG/32R-PPB32U99
A10VSO140DG/32R-VPB32U00
A10VSO140DG/32R-VPB32U99
A10VSO180DR/32R-PPB22U00
A10VSO140DRF/32R-VPB22U00
A10VSO180DRG/32R-PPB22U00
A10VSO140DRF/32R-VPB22U99
A10VSO180DG/32R-PPB22U00
A10VSO180DRF/32R-PPB22U00
Installation & Commissioning
What are the critical installation precautions for the A10VSO pump?
Proper installation is critical to avoid premature failure. Follow these key guidelines:
- Mounting Position: Install the pump horizontally (drive shaft parallel to the ground) to ensure proper lubrication. Vertical mounting (drive shaft upward) is allowed but requires a minimum oil level in the reservoir to prevent cavitation.
- Drive Connection: Use a flexible coupling (e.g., jaw coupling) to align the pump drive shaft with the motor shaft (misalignment ≤0.1 mm radial, ≤0.2 mm axial). Avoid using belts or chains, which cause excessive shaft stress.
- Suction Line Requirements: The suction line diameter must be ≥ the pump's suction port diameter; keep the line as short as possible (≤1.5 meters) with minimal bends. Ensure the suction filter has a flow capacity ≥1.5x the pump's maximum flow (filtration precision 100 μm).
- Discharge Line Installation: Install a pressure gauge and relief valve (set to 10% above the system's maximum operating pressure) in the discharge line. Use flexible hoses near the pump to absorb vibration.
- Reservoir Ventilation: The hydraulic reservoir must have a breather filter (ISO 16/13) to prevent contamination and maintain atmospheric pressure.
How to perform the initial commissioning of the A10VSO pump?
Commissioning should be conducted by qualified technicians in a step-by-step manner to ensure safe and optimal operation:
- Pre-Commissioning Check: Verify all connections (mechanical, hydraulic, electrical) are secure and correctly aligned.
- Check the hydraulic reservoir oil level (must be 20-30% above the suction port) and fluid quality.
- Ensure all valves (suction, discharge, relief) are in the open position.
- Priming the Pump: Loosen the air bleed screw on the pump's discharge port.
- Manually rotate the pump drive shaft 5-10 times (using a wrench) to fill the pump with oil and expel air.
- Tighten the air bleed screw once oil flows out without bubbles.
- Initial Start-Up: Start the motor at low speed (500-1000 rpm) for 1-2 minutes.
- Check for abnormal noise, vibration, or oil leaks. Stop immediately if any issues are detected.
- Gradually increase the speed to the nominal operating range (1000-2800 rpm).
- Control Calibration: For pressure-compensated models: Adjust the pressure setpoint using the compensator screw (refer to the system's pressure requirement).
- For electro-hydraulic models: Send a 0-100% electrical signal and verify that the pump's displacement changes linearly (use a flow meter to confirm flow rate).
- Load Test: Apply gradual load to the system (up to the maximum operating pressure).
- Confirm that the pump's control mechanism responds correctly (e.g., pressure compensator reduces flow at set pressure).
- Monitor pump temperature (should not exceed 60°C after 30 minutes of operation).
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Xiamen Lang Ye Hydraulic Electromechanical Equipment Co., Ltd
Location
Xia'Men City, China
Contact Person
zixin